Differences between revisions 1 and 122 (spanning 121 versions)
Revision 1 as of 2013-10-25 19:36:17
Size: 9279
Editor: mrt-lx20
Comment:
Revision 122 as of 2015-02-24 16:24:51
Size: 9838
Editor: mrt-lx7
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
##acl GismoTeam,NicolasBillot,hermelo:read,write,delete,revert,admin Default
##http://www.iram.es/IRAMES/mainWiki/GISMO/Main
#acl hermelo,CarstenKramer,NicolasBillot,SamuelLeclerc,GismoTeam:read,write,delete,revert,admin Default
Line 6: Line 5:
<<Anchor(beginOfPage)>> The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn.
Line 8: Line 7:
<<TableOfContents(2)>> <<TableOfContents(3)>>

'''[[ http://www.iram.es/IRAMES/mainWiki/FrontPage | Go to the Front Page ]]'''
Line 14: Line 15:
|| || '''Pixels''' || '''Wavelength''' || '''Bandwidth (FWHM)''' || '''Sensitivity (out of atmosphere)''' || '''HPBW''' || '''Field-of-View''' || '''Spacing''' ||
||GISMO since 2012 || 8x16 || 2.0 mm || 140-162 GHz || 14 mJy*s^1/2^ || 16.7" || 1.8' x 3.7' || 13.75" ||
Line 17: Line 16:
The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn. GISMO consists of '''8x16 pixels''' with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is 140-162 GHz (FWHM), pixels are spaced by '''13.75"''', the telescope HPBW is '''16.7"'''. The sensitivity has improved relative to the April 2011 run to a media value of about '''14 mJy sqrt(sec)''' (cf. reports below). The field-of-view is ''' 1.8'x3.7' '''. Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to
create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8% (cf. report below).
GISMO consists of '''8x16 pixels''' with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is centred at 2 mm (150 GHz). The is shown in Figure 1. Pixels are spaced by '''13.75"''' and the telescope HPBW is '''16.7"'''. The sensitivity is about '''14 mJy sqrt(sec)''' . The field-of-view is ''' 1.8'x3.7' '''. Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to
create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8%. GISMO has been available to observers since the winter semester 2011/12.

|| || '''Pixels''' || '''Wavelength''' || '''Bandwidth (FWHM)''' || '''Sensitivity (out of atmosphere)''' || '''HPBW''' || '''Field-of-View''' || '''Spacing''' ||
||'''GISMO''' || 8x16 || 2.0 mm || 140-162 GHz || 14 mJy*s^1/2^ || 16.7" || 1.8' x 3.7' || 13.75" ||

The quoted sensitivity is the median sensitivity of the crush default reduction using the data of the pool runs of April 2012 and 2013. See the reports of Bruni et al. 2012 and Hermelo et al. 2013 below.

{{attachment:GISMO_TRANSMISSION.png | GISMO transmission | width=950}}

GISMO bandpass filter measured in the lab ([[attachment:GISMO_TRANSMISSION.txt | transmission function]] extracted from 2mm_BP_angles_Jul06.xls of J.Staguhn, 31-Oct-2013)

The Point Spread Function of GISMO can be downloaded from the [[http://www.submm.caltech.edu/~sharc/crush/instruments/gismo/index.html | CRUSH web site]].
Line 22: Line 32:
== Call for proposals for the winter semester 2013/14 == == Call for proposals ==
Line 24: Line 34:
GISMO is offered again to the community: GISMO is offered again to the community the winter semester 2013/14:
Line 26: Line 36:
 * [[http://www.iram-institute.org/EN/content-page-169-7-57-169-0-0.html|Call for observing proposals with the 30m]]
 * [[attachment:TimeEstimator_v3.pdf|Updated guidelines to estimate observing times (Billot et al. 2013)]].
 * [[attachment:3rdGISMOpool_public_v2.pdf|Report on GISMO performance based on the pool run in April-2013 (Hermelo et al. 2013)]].
 * [[attachment:bruni-aug2012-gismo.pdf|Report on GISMO performance based on the pool run in April-2012 (Bruni et al. 2012)]].
 * [[http://www.iram-institute.org/EN/content-page-169-7-57-169-0-0.html | Call for observing proposals with the 30m]]
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/TimeEstimatorScript | Guidelines to estimate observing times]].
Line 34: Line 41:
== Documentation == == Documentation and Publications ==
 
 * Documentation
  * [[attachment:5thGISMOpool.pdf | Report on GISMO performance based on the 5th pool run (April 2014)]].
  * [[attachment:4thGISMOpool.pdf | Report on GISMO performance based on the 4th pool run (October/November 2013)]].
  * [[attachment:3rdGISMOpool.pdf | Report on GISMO performance based on the 3rd pool run (April 2013)]].
  * [[attachment:2ndGISMOpool.pdf | Report on GISMO performance based on the 2nd pool run (October/November 2012)]].
  * [[attachment:1stGISMOpool.pdf | Report on GISMO performance based on the 1st pool run (April 2012)]].
  * [[attachment:GISMO_Manual_2013.12.pdf | GISMO Software Operational Manual]] by Steve Maher and Johannes Staguhn (Dec 2013)
  * [[attachment:GISMO_NCS_2013.12.pdf | GISMO NCS Software Interface and FITS File Description]] by Steve Maher, Attila Kovacs, Albrecht Sievers (Dec 2013)
  * [[https://mrt-lx1.iram.es/mainWiki/GismoInfo | IRAM-internal GISMO recycling instructions for operators]]
Line 36: Line 53:
 * [[attachment:GISMO Software Operational Manual - May 2013]] by Steve Maher and Johannes Staguhn, May 2013

 * [[attachment:GISMONCSInterfaceandFITSFormatv0.5.pdf
|GISMO NCS Software Interface and FITS File Description]] by Steve Maher, Attila Kovacs, Albrecht Sievers, April 2012

----

== Publications ==
 
 1. [[http://arxiv.org/abs/1106.2092|
Dwek, Staguhn et al. 2011]] ApJ, <<BR>> '''Star and dust formation activities in AzTEC-3: A starburst galaxy at z = 5.3'''
 1. [[http://arxiv.org/abs/1103.6225|Arendt et al. 2011]] ApJ, <<BR>> '''The Radio - 2 mm Spectral Index of the Crab Nebula Measured with GISMO'''
 1. [[http://arxiv.org/abs/1101.3586|Capack et al. 2011]] Nature, <<BR>> '''A massive proto-cluster of galaxies at a redshift of z~5.3'''
 1. [[http://arxiv.org/abs/0907.1300|Dicker et al. 2009]] ApJ, <<BR>> '''90GHz and 150GHz observations of the Orion M42 region. A sub-millimeter to radio analysis'''
 1. [[http://iopscience.iop.org/1742-6596/155/1/012001/pdf/jpconf9_155_012001.pdf|Benford, Moseley, Zmuidzinas 2009]] Journal of Physics <<BR>>'''Direct detectors for the Einstein inflation probe'''
 1. [[http://www.iram.fr/IRAMFR/ARN/feb09/node12.html|IRAM Newsletter 2/2009]] <<BR>> '''GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer tested at the IRAM 30m observatory'''
 1. [[http://esoads.eso.org/abs/2008JLTP..151..709S|Staguhn et al. 2008]] Journal of Low Temperature Physics, 151, 3, 709 <<BR>>'''GISMO, a 2 mm Bolometer Camera Optimized for the Study of High Redshift Galaxies'''
 * Publications
  * [[http
://adsabs.harvard.edu/abs/2013arXiv1311.1485S | Staguhn et al. 2013]] arXiv, <<BR>> '''The GISMO 2-millimeter Deep Field in GOODS-N'''
  * [[http://arxi
v.org/abs/1106.2092 | Dwek, Staguhn et al. 2011]] ApJ, <<BR>> '''Star and dust formation activities in AzTEC-3: A starburst galaxy at z = 5.3'''
  * [[http://arxiv.org/abs/1103.6225 | Arendt et al. 2011]] ApJ, <<BR>> '''The Radio - 2 mm Spectral Index of the Crab Nebula Measured with GISMO'''
  * [[http://arxiv.org/abs/1101.3586 | Capack et al. 2011]] Nature, <<BR>> '''A massive proto-cluster of galaxies at a redshift of z~5.3'''
  * [[http://arxiv.org/abs/0907.1300 | Dicker et al. 2009]] ApJ, <<BR>> '''90GHz and 150GHz observations of the Orion M42 region. A sub-millimeter to radio analysis'''
  * [[http://iopscience.iop.org/1742-6596/155/1/012001/pdf/jpconf9_155_012001.pdf | Benford, Moseley, Zmuidzinas 2009]] Journal of Physics <<BR>>'''Direct detectors for the Einstein inflation probe'''
  * [[http://www.iram.fr/IRAMFR/ARN/feb09/node12.html | IRAM Newsletter 2/2009]] <<BR>> '''GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer tested at the IRAM 30m observatory'''
  * [[attachment:GISMO_overview.pdf | Staguhn et al. 2008]] Journal of Low Temperature Physics, 151, 3, 709 <<BR>>'''GISMO, a 2 mm Bolometer Camera Optimized for the Study of High Redshift Galaxies'''
Line 56: Line 67:
 * Overall coordinator: '''Samuel Leclercq''' <leclercq@iram.fr> (IRAM/Grenoble)
 * GISMO support team:    * '''Johannes Staguhn''' <johannes.g.staguhn@nasa.gov> (PI)
   * Elmer Sharp
   * Steve Maher
   * Dale Fixen
   * Attila Kovacs (crush)
 * Overall coordinator:
  *
'''Samuel Leclercq''' (IRAM/Grenoble, <leclercq@iram.fr>)

 * GISMO support team:
* '''Johannes Staguhn ''' (GISMO PI, <johannes.g.staguhn@nasa.gov>)
  * Elmer Sharp
  * Steve Maher
  * Dale Fixen
  * Attila Kovacs
(crush)
Line 64: Line 78:
   * '''Carsten Kramer''' (station manager, <kramer@iram.es>)
   * Israel Hermelo (bolometer pool manager, <hermelo@iram.es>)
   * Albrecht Sievers (friend of GISMO, <sievers@iram.es>)
   * Manuel Gonzalez (heterodyne pool manager, <gonzalez@iram.es>)
   * Nicolas Billot (30m scheduler, <billot@iram.es>)
  * '''Carsten Kramer''' (Station Manager, <kramer@iram.es>)
  * Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>)
  * Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>)
  * Nicolas Billot (30m scheduler, <billot@iram.es>)
  * Albrecht Sievers (friend of GISMO, <sievers@iram.es>)
Line 72: Line 86:
== Observations == == How-to's ==
Line 74: Line 88:
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolPreparation | Pool Preparation]] provides information on the observing modes offered for the continuum cameras as well as examples of the scripts that you need to prepare to observe your project.
Line 75: Line 90:
=== How to observe ===  * [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObservingSession | Observing Session]] provides an example of a typical session with the continuum cameras at the 30m telescope.
Line 77: Line 92:
The [[http://www.iram.es/IRAMES/mainWiki/GISMOforDummies | Quick GISMO guide for dummies]] provides examples and explanations about how to start !PaKo in order to run the telescope with GISMO, and about total power maps using Lissajous and On-the-fly patterns. Observations using the wobbler will not be offered for this run.  * [[http://www.iram.es/IRAMES/mainWiki/Continuum/Calibrators | Pointing sources and calibrators ]] provides a list of pointing sources and calibrators for the IRAM 30m continuum cameras.
Line 79: Line 94:
## [[http://www.iram.es/IRAMES/mainWiki/GismoObservingScripts | GismoObservingScripts ]]
## The old page GismoHowToObserve is obsolete.
## [[https://www.iram.es/IRAMES/mainWiki/GismoPakoNotes|Notes on paKo and NCS for GISMO 2012]]
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/GISMO/DataReduction | Data Reduction]] provides some basic examples to reduce GISMO data using [[http://www.submm.caltech.edu/~sharc/crush/ | CRUSH ]]. For more detail please see the [[http://www.submm.caltech.edu/~sharc/crush/document.html| CRUSH documentation]].
Line 83: Line 96:
=== Pointing Sources ===  * [[https://mrt-lx1.iram.es/mainWiki/GismoInfo | GISMO recycling guide]] provides instructions for operators and !AoDs of the GISMO recycling.
Line 85: Line 98:
[[http://www.iram.es/IRAMES/FluxMonitoring/PointingSources/plotPointingSources.html|Plots for Pointing Sources]] can be accessed within the IRAM network. These data are provided ONLY to help in the planning of observations, in particular to select pointing and focus sources at the IRAM 30-m telescope. They should not be used for any other purpose.


=== Data reduction ===

GISMO data are reduced using CRUSH (Comprehensive Reduction Utility for SHARC2 - and more).

 * [[http://www.submm.caltech.edu/~sharc/crush/ | CRUSH website]]
 * [[http://www.submm.caltech.edu/~sharc/crush/download.html | Download CRUSH]]
 * [[http://www.iram.es/IRAMES/mainWiki/CrushExamples | Quick introduction to CRUSH]]
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObserveGRBs | Observe GRBs]] {*}
Line 98: Line 102:
== 4th GISMO pool (October/November 2013) == == 7th GISMO pool (February/March 2015) ==
Line 100: Line 104:
The 4th GISMO pool will take place from the 22nd of October to the 5th of November 2013.
Observations will be carried from a dedicated pool account (I. Hermelo will provide login information).
The 7th GISMO pool will take place from the 24th of February to the 3rd of March 2015.
Observations will be carried from a dedicated pool account (Israel Hermelo will provide login information).
Line 107: Line 111:
 * [[http://www.iram.es/IRAMES/mainWiki/ProjectsPoolS13 | List of accepted projects.]]  * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/7thGISMOpool | 7th GISMO pool organization.]] 
Line 109: Line 113:
 * [[http://www.iram.es/IRAMES/mainWiki/PoolS13 | Pool observers for the October/November 2013 run]]
Line 113: Line 116:
The progress of the 4th GISMO pool can be followed via: The progress of the 7th GISMO pool can be followed via:
Line 115: Line 118:
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolLogs/7thGISMOpool | 7th GISMO pool daily log.]]
Line 118: Line 122:

=== Status ===

 * ''' 2013.09.24 23:00 UT:''' Stopped by strong wind. TAU(225GHz)~0.6
 * ''' 2013.09.23 09:00 UT:''' Bad weather conditions. Testing new scripts on Mars
 * ''' 2013.09.22 14:00 UT:''' Stopped by bad weather conditions (strong wind and rain)
Line 130: Line 127:
=== 3rd GISMO pool (April 2013) ===  * '''6th GISMO pool''' (October 2014)
Line 132: Line 129:
==== Pool projects and observers ====   * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/6thGISMOpool | 6th GISMO pool organization.]]
Line 134: Line 131:
 * Winter semester 2012 observations will be carried out as pooled observations from a dedicated pool account. M.Gonzalez will provide login information.  * '''5th GISMO pool''' (April 2014)
Line 136: Line 133:
 * [[http://www.iram.fr/php/rel_sched/bgfiles/13/Bolopool-w12.html|List of accepted projects.]]   * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/5thGISMOpool | 5th GISMO pool organization.]]
Line 138: Line 135:
 * Progress of observations can be followed via the [[https://pools.iram.es|pool data base]].  * '''4th GISMO pool''' (October/November 2013)
Line 140: Line 137:
 * [[http://www.iram.es/IRAMES/mainWiki/PoolW12 |Pool observers for the April 2013 run]]   * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/4thGISMOpool | 4th GISMO pool organization.]]
Line 144: Line 141:
=== 2nd GISMO pool (November 2012) ===  * '''3rd GISMO pool''' (April 2013)
Line 146: Line 143:
Two weeks of dedicated GISMO observations have been carried out during November 2012.   * [[http://www.iram.fr/php/rel_sched/bgfiles/13/Bolopool-w12.html | List of accepted projects.]]
Line 148: Line 145:
==== Pool projects and observers ====   * [[http://www.iram.es/IRAMES/mainWiki/PoolW12 |Pool observers for the April 2013 run]]
Line 151: Line 148:
 * [[http://www.iram.fr/php/rel_sched/bgfiles/12/bolopool-S12.html|List of accepted projects.]]  * '''2nd GISMO pool''' (November 2012)
Line 153: Line 150:
 * [[http://www.iram.es/IRAMES/mainWiki/PoolS12 |Pool observers for the November 2012 run]]   * [[http://www.iram.fr/php/rel_sched/bgfiles/12/bolopool-S12.html | List of accepted projects.]]
Line 155: Line 152:
 * [[attachment:GISMO_observations_summary.pdf|Observations summary]].   * [[http://www.iram.es/IRAMES/mainWiki/PoolS12 |Pool observers for the November 2012 run]]
Line 158: Line 155:

==== Daily reports ====

 * GismoRun7
 * '''1st GISMO pool''' (April 2012)
 
  * [[http://www.iram.fr/php/rel_sched/bgfiles/12/bolopool-W11.html | List of accepted projects.]]
Line 164: Line 160:
 * '''5th alignment run''' (March 2012)
  
  * [[GismoRun5|Go to the 5th run Wiki page]]
Line 165: Line 164:
=== 1st GISMO pool (April 2012) ===
In September 2011, GISMO had for the 1st time been offered to the community. Two weeks of dedicated GISMO observations have been carried out during April 2012.
 * '''4th test run''' (April 2011)
Line 168: Line 166:
  * [[GismoRun4|Go to the 4th run Wiki page]]
Line 169: Line 168:
==== Daily reports ====  * '''3rd test run''' (April 2010)
Line 171: Line 170:
 * GismoRun6    * [[GismoRun3|Go to the 3rd run Wiki page]]
Line 173: Line 172:
 * '''2nd test run''' (October 2008)
Line 174: Line 174:
==== Test plan ====   * [[GismoRun2|Go to the 2nd run Wiki page]]
Line 176: Line 176:
 * TestPlan for the first days of the April run
 * GismoToDoList
 * '''1st test run''' (November 2007)
Line 179: Line 178:

=== 5th alignment run, March 2012 ===

    [[GismoRun5|Go to the 5th run Wiki page]] (installation of GISMO at a permanent position with new optics, baffle and new filter)

=== 4th test run, April 2011 ===

    [[GismoRun4|Go to the 4th run Wiki page]] (restricted access, please send an email to SL to obtain the login information)

=== 3rd test run, April 2010 ===

    [[GismoRun3|Go to the 3rd run Wiki page]]

=== 2nd test run, October 2008 ===

    [[GismoRun2|Go to the 2nd run Wiki page]]

=== 1st test run, November 2007 ===

    [[GismoRun1|Go to the 1st run Wiki page]]
  * [[GismoRun1|Go to the 1st run Wiki page]]
Line 202: Line 182:
Author: Israel Hermelo (GISMO pool manager) Author: Israel Hermelo ([[http://www.iram.es/IRAMES/mainWiki/Continuum/GISMO/Main|GISMO]] &[[http://www.iram.es/IRAMES/mainWiki/NIKA/Main|NIKA]] Pool Manager)
Line 206: Line 186:
Created: 2013.10.25 Created: 2013.OCT.25
Line 208: Line 188:
This page is maintained by IH, CK, SL and the GISMO team

Last update: 2013.10.25
Last update: 2014.OCT.16

GISMO

The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn.

Go to the Front Page


Overview

GISMO consists of 8x16 pixels with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is centred at 2 mm (150 GHz). The is shown in Figure 1. Pixels are spaced by 13.75" and the telescope HPBW is 16.7". The sensitivity is about 14 mJy sqrt(sec) . The field-of-view is 1.8'x3.7' . Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8%. GISMO has been available to observers since the winter semester 2011/12.

Pixels

Wavelength

Bandwidth (FWHM)

Sensitivity (out of atmosphere)

HPBW

Field-of-View

Spacing

GISMO

8x16

2.0 mm

140-162 GHz

14 mJy*s1/2

16.7"

1.8' x 3.7'

13.75"

The quoted sensitivity is the median sensitivity of the crush default reduction using the data of the pool runs of April 2012 and 2013. See the reports of Bruni et al. 2012 and Hermelo et al. 2013 below.

GISMO transmission

GISMO bandpass filter measured in the lab (transmission function extracted from 2mm_BP_angles_Jul06.xls of J.Staguhn, 31-Oct-2013)

The Point Spread Function of GISMO can be downloaded from the CRUSH web site.


Call for proposals

GISMO is offered again to the community the winter semester 2013/14:


Documentation and Publications


Support teams


How-to's


7th GISMO pool (February/March 2015)

The 7th GISMO pool will take place from the 24th of February to the 3rd of March 2015. Observations will be carried from a dedicated pool account (Israel Hermelo will provide login information).

Pool projects and observers

For information about the accepted projects and the observers at the 30m please go to:

Progress

The progress of the 7th GISMO pool can be followed via:


Previous observing runs


Author: Israel Hermelo (GISMO &NIKA Pool Manager)

email: hermelo@iram.es

Created: 2013.OCT.25

Last update: 2014.OCT.16

Continuum/GISMO/Main (last edited 2015-02-26 17:56:08 by dhcp-185)