<<Anchor(beginOfPage)>> | The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn. |
Line 8: | Line 7: |
<<TableOfContents(2)>> | <<TableOfContents(3)>> '''[[ http://www.iram.es/IRAMES/mainWiki/FrontPage | Go to the Front Page ]]''' |
Line 14: | Line 15: |
|| || '''Pixels''' || '''Wavelength''' || '''Bandwidth (FWHM)''' || '''Sensitivity (out of atmosphere)''' || '''HPBW''' || '''Field-of-View''' || '''Spacing''' || ||GISMO since 2012 || 8x16 || 2.0 mm || 140-162 GHz || 14 mJy*s^1/2^ || 16.7" || 1.8' x 3.7' || 13.75" || |
|
Line 17: | Line 16: |
The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn. GISMO consists of '''8x16 pixels''' with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is 140-162 GHz (FWHM), pixels are spaced by '''13.75"''', the telescope HPBW is '''16.7"'''. The sensitivity has improved relative to the April 2011 run to a media value of about '''14 mJy sqrt(sec)''' (cf. reports below). The field-of-view is ''' 1.8'x3.7' '''. Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8% (cf. report below). |
GISMO consists of '''8x16 pixels''' with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is centred at 2 mm (150 GHz). The is shown in Figure 1. Pixels are spaced by '''13.75"''' and the telescope HPBW is '''16.7"'''. The sensitivity is about '''14 mJy sqrt(sec)''' . The field-of-view is ''' 1.8'x3.7' '''. Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8%. GISMO has been available to observers since the winter semester 2011/12. || || '''Pixels''' || '''Wavelength''' || '''Bandwidth (FWHM)''' || '''Sensitivity (out of atmosphere)''' || '''HPBW''' || '''Field-of-View''' || '''Spacing''' || ||'''GISMO''' || 8x16 || 2.0 mm || 140-162 GHz || 14 mJy*s^1/2^ || 16.7" || 1.8' x 3.7' || 13.75" || The quoted sensitivity is the median sensitivity of the crush default reduction using the data of the pool runs of April 2012 and 2013. See the reports of Bruni et al. 2012 and Hermelo et al. 2013 below. {{attachment:GISMO_TRANSMISSION.png | GISMO transmission | width=950}} <<BR>> GISMO bandpass filter measured in the lab ([[attachment:GISMO_TRANSMISSION.txt | transmission function]] extracted from 2mm_BP_angles_Jul06.xls of J.Staguhn, 31-Oct-2013) The Point Spread Function of GISMO can be downloaded from the [[http://www.submm.caltech.edu/~sharc/crush/instruments/gismo/index.html | CRUSH web site]]. |
Line 22: | Line 30: |
== Call for proposals for the winter semester 2013/14 == | == Call for proposals == |
Line 24: | Line 32: |
GISMO is offered again to the community: | GISMO is offered again to the community the winter semester 2013/14: |
Line 26: | Line 34: |
* [[http://www.iram-institute.org/EN/content-page-169-7-57-169-0-0.html|Call for observing proposals with the 30m]] * [[attachment:TimeEstimator_v3.pdf|Updated guidelines to estimate observing times (Billot et al. 2013)]]. * [[attachment:3rdGISMOpool_public_v2.pdf|Report on GISMO performance based on the pool run in April-2013 (Hermelo et al. 2013)]]. * [[attachment:bruni-aug2012-gismo.pdf|Report on GISMO performance based on the pool run in April-2012 (Bruni et al. 2012)]]. |
* [[http://www.iram-institute.org/EN/content-page-169-7-57-169-0-0.html | Call for observing proposals with the 30m]] * [[http://www.iram.es/IRAMES/mainWiki/Continuum/TimeEstimatorScript | Guidelines to estimate observing times]]. |
Line 34: | Line 39: |
== Documentation == | == Documentation and Publications == * Documentation * [[attachment:5thGISMOpool.pdf | Report on GISMO performance based on the 5th pool run (April 2014)]]. * [[attachment:4thGISMOpool.pdf | Report on GISMO performance based on the 4th pool run (October/November 2013)]]. * [[attachment:3rdGISMOpool.pdf | Report on GISMO performance based on the 3rd pool run (April 2013)]]. * [[attachment:2ndGISMOpool.pdf | Report on GISMO performance based on the 2nd pool run (October/November 2012)]]. * [[attachment:1stGISMOpool.pdf | Report on GISMO performance based on the 1st pool run (April 2012)]]. * [[attachment:GISMO_Manual_2013.12.pdf | GISMO Software Operational Manual]] by Steve Maher and Johannes Staguhn (Dec 2013) * [[attachment:GISMO_NCS_2013.12.pdf | GISMO NCS Software Interface and FITS File Description]] by Steve Maher, Attila Kovacs, Albrecht Sievers (Dec 2013) * [[https://mrt-lx1.iram.es/mainWiki/GismoInfo | IRAM-internal GISMO recycling instructions for operators]] |
Line 36: | Line 51: |
* [[attachment:GISMO Software Operational Manual - May 2013]] by Steve Maher and Johannes Staguhn, May 2013 * [[attachment:GISMONCSInterfaceandFITSFormatv0.5.pdf|GISMO NCS Software Interface and FITS File Description]] by Steve Maher, Attila Kovacs, Albrecht Sievers, April 2012 ---- == Publications == 1. [[http://arxiv.org/abs/1106.2092|Dwek, Staguhn et al. 2011]] ApJ, <<BR>> '''Star and dust formation activities in AzTEC-3: A starburst galaxy at z = 5.3''' 1. [[http://arxiv.org/abs/1103.6225|Arendt et al. 2011]] ApJ, <<BR>> '''The Radio - 2 mm Spectral Index of the Crab Nebula Measured with GISMO''' 1. [[http://arxiv.org/abs/1101.3586|Capack et al. 2011]] Nature, <<BR>> '''A massive proto-cluster of galaxies at a redshift of z~5.3''' 1. [[http://arxiv.org/abs/0907.1300|Dicker et al. 2009]] ApJ, <<BR>> '''90GHz and 150GHz observations of the Orion M42 region. A sub-millimeter to radio analysis''' 1. [[http://iopscience.iop.org/1742-6596/155/1/012001/pdf/jpconf9_155_012001.pdf|Benford, Moseley, Zmuidzinas 2009]] Journal of Physics <<BR>>'''Direct detectors for the Einstein inflation probe''' 1. [[http://www.iram.fr/IRAMFR/ARN/feb09/node12.html|IRAM Newsletter 2/2009]] <<BR>> '''GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer tested at the IRAM 30m observatory''' 1. [[http://esoads.eso.org/abs/2008JLTP..151..709S|Staguhn et al. 2008]] Journal of Low Temperature Physics, 151, 3, 709 <<BR>>'''GISMO, a 2 mm Bolometer Camera Optimized for the Study of High Redshift Galaxies''' |
* Publications * [[http://adsabs.harvard.edu/abs/2013arXiv1311.1485S | Staguhn et al. 2013]] arXiv, <<BR>> '''The GISMO 2-millimeter Deep Field in GOODS-N''' * [[http://arxiv.org/abs/1106.2092 | Dwek, Staguhn et al. 2011]] ApJ, <<BR>> '''Star and dust formation activities in AzTEC-3: A starburst galaxy at z = 5.3''' * [[http://arxiv.org/abs/1103.6225 | Arendt et al. 2011]] ApJ, <<BR>> '''The Radio - 2 mm Spectral Index of the Crab Nebula Measured with GISMO''' * [[http://arxiv.org/abs/1101.3586 | Capack et al. 2011]] Nature, <<BR>> '''A massive proto-cluster of galaxies at a redshift of z~5.3''' * [[http://arxiv.org/abs/0907.1300 | Dicker et al. 2009]] ApJ, <<BR>> '''90GHz and 150GHz observations of the Orion M42 region. A sub-millimeter to radio analysis''' * [[http://iopscience.iop.org/1742-6596/155/1/012001/pdf/jpconf9_155_012001.pdf | Benford, Moseley, Zmuidzinas 2009]] Journal of Physics <<BR>>'''Direct detectors for the Einstein inflation probe''' * [[http://www.iram.fr/IRAMFR/ARN/feb09/node12.html | IRAM Newsletter 2/2009]] <<BR>> '''GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer tested at the IRAM 30m observatory''' * [[attachment:GISMO_overview.pdf | Staguhn et al. 2008]] Journal of Low Temperature Physics, 151, 3, 709 <<BR>>'''GISMO, a 2 mm Bolometer Camera Optimized for the Study of High Redshift Galaxies''' |
Line 56: | Line 65: |
* Overall coordinator: '''Samuel Leclercq''' <leclercq@iram.fr> (IRAM/Grenoble) * GISMO support team: * '''Johannes Staguhn''' <johannes.g.staguhn@nasa.gov> (PI) * Elmer Sharp * Steve Maher * Dale Fixen * Attila Kovacs (crush) |
* Overall coordinator: * '''Samuel Leclercq''' (IRAM/Grenoble, <leclercq@iram.fr>) * GISMO support team: * '''Johannes Staguhn ''' (GISMO PI, <johannes.g.staguhn@nasa.gov>) * Elmer Sharp * Steve Maher * Dale Fixen * Attila Kovacs (crush) |
Line 64: | Line 76: |
* '''Carsten Kramer''' (station manager, <kramer@iram.es>) * Israel Hermelo (bolometer pool manager, <hermelo@iram.es>) * Albrecht Sievers (friend of GISMO, <sievers@iram.es>) * Manuel Gonzalez (heterodyne pool manager, <gonzalez@iram.es>) * Nicolas Billot (30m scheduler, <billot@iram.es>) |
* '''Carsten Kramer''' (Station Manager, <kramer@iram.es>) * Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>) * Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>) * Nicolas Billot (30m scheduler, <billot@iram.es>) * Albrecht Sievers (friend of GISMO, <sievers@iram.es>) |
Line 72: | Line 84: |
== Observations == | == How-to's == |
Line 74: | Line 86: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolPreparation | Pool Preparation]] provides information on the observing modes offered for the continuum cameras as well as examples of the scripts that you need to prepare to observe your project. | |
Line 75: | Line 88: |
=== How to observe === | * [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObservingSession | Observing Session]] provides an example of a typical session with the continuum cameras at the 30m telescope. |
Line 77: | Line 90: |
The [[http://www.iram.es/IRAMES/mainWiki/GISMOforDummies | Quick GISMO guide for dummies]] provides examples and explanations about how to start !PaKo in order to run the telescope with GISMO, and about total power maps using Lissajous and On-the-fly patterns. Observations using the wobbler will not be offered for this run. | * [[http://www.iram.es/IRAMES/mainWiki/Continuum/Calibrators | Pointing sources and calibrators ]] provides a list of pointing sources and calibrators for the IRAM 30m continuum cameras. |
Line 79: | Line 92: |
## [[http://www.iram.es/IRAMES/mainWiki/GismoObservingScripts | GismoObservingScripts ]] ## The old page GismoHowToObserve is obsolete. ## [[https://www.iram.es/IRAMES/mainWiki/GismoPakoNotes|Notes on paKo and NCS for GISMO 2012]] |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/GISMO/DataReduction | Data Reduction]] provides some basic examples to reduce GISMO data using [[http://www.submm.caltech.edu/~sharc/crush/ | CRUSH ]]. For more detail please see the [[http://www.submm.caltech.edu/~sharc/crush/document.html| CRUSH documentation]]. |
Line 83: | Line 94: |
=== Pointing Sources === | * [[https://mrt-lx1.iram.es/mainWiki/GismoInfo | GISMO recycling guide]] provides instructions for operators and !AoDs of the GISMO recycling. |
Line 85: | Line 96: |
[[http://www.iram.es/IRAMES/FluxMonitoring/PointingSources/plotPointingSources.html|Plots for Pointing Sources]] can be accessed within the IRAM network. These data are provided ONLY to help in the planning of observations, in particular to select pointing and focus sources at the IRAM 30-m telescope. They should not be used for any other purpose. === Data reduction === GISMO data are reduced using CRUSH (Comprehensive Reduction Utility for SHARC2 - and more). * [[http://www.submm.caltech.edu/~sharc/crush/ | CRUSH website]] * [[http://www.submm.caltech.edu/~sharc/crush/download.html | Download CRUSH]] * [[http://www.iram.es/IRAMES/mainWiki/CrushExamples | Quick introduction to CRUSH]] |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObserveGRBs | Observe GRBs]] {*} |
Line 98: | Line 100: |
== 4th GISMO pool (October/November 2013) == | == 6th GISMO pool (October 2014) == |
Line 100: | Line 102: |
The 4th GISMO pool will take place from the 22nd of October to the 5th of November 2013. Observations will be carried from a dedicated pool account (I. Hermelo will provide login information). |
The 6th GISMO pool will take place from the 21st to the 28th of October 2014. Observations will be carried from a dedicated pool account (Israel Hermelo will provide login information). |
Line 107: | Line 109: |
* [[http://www.iram.es/IRAMES/mainWiki/ProjectsPoolS13 | List of accepted projects.]] | * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/6thGISMOpool | 6th GISMO pool organization.]] |
Line 109: | Line 111: |
* [[http://www.iram.es/IRAMES/mainWiki/PoolS13 | Pool observers for the October/November 2013 run]] | |
Line 113: | Line 114: |
The progress of the 4th GISMO pool can be followed via: | The progress of the 6th GISMO pool can be followed via: |
Line 119: | Line 120: |
=== Status === * ''' 2013.09.24 23:00 UT:''' Stopped by strong wind. TAU(225GHz)~0.6 * ''' 2013.09.23 09:00 UT:''' Bad weather conditions. Testing new scripts on Mars * ''' 2013.09.22 14:00 UT:''' Stopped by bad weather conditions (strong wind and rain) |
|
Line 130: | Line 124: |
=== 3rd GISMO pool (April 2013) === | |
Line 132: | Line 125: |
==== Pool projects and observers ==== | * '''5th GISMO pool''' (April 2014) |
Line 134: | Line 127: |
* Winter semester 2012 observations will be carried out as pooled observations from a dedicated pool account. M.Gonzalez will provide login information. | * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/5thGISMOpool | 5th GISMO pool organization.]] |
Line 136: | Line 129: |
* [[http://www.iram.fr/php/rel_sched/bgfiles/13/Bolopool-w12.html|List of accepted projects.]] | * '''4th GISMO pool''' (October/November 2013) |
Line 138: | Line 131: |
* Progress of observations can be followed via the [[https://pools.iram.es|pool data base]]. * [[http://www.iram.es/IRAMES/mainWiki/PoolW12 |Pool observers for the April 2013 run]] |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/4thGISMOpool | 4th GISMO pool organization.]] |
Line 144: | Line 135: |
=== 2nd GISMO pool (November 2012) === | * '''3rd GISMO pool''' (April 2013) |
Line 146: | Line 137: |
Two weeks of dedicated GISMO observations have been carried out during November 2012. | * [[http://www.iram.fr/php/rel_sched/bgfiles/13/Bolopool-w12.html | List of accepted projects.]] |
Line 148: | Line 139: |
==== Pool projects and observers ==== | * [[http://www.iram.es/IRAMES/mainWiki/PoolW12 |Pool observers for the April 2013 run]] |
Line 151: | Line 142: |
* [[http://www.iram.fr/php/rel_sched/bgfiles/12/bolopool-S12.html|List of accepted projects.]] | * '''2nd GISMO pool''' (November 2012) |
Line 153: | Line 144: |
* [[http://www.iram.es/IRAMES/mainWiki/PoolS12 |Pool observers for the November 2012 run]] | * [[http://www.iram.fr/php/rel_sched/bgfiles/12/bolopool-S12.html | List of accepted projects.]] |
Line 155: | Line 146: |
* [[attachment:GISMO_observations_summary.pdf|Observations summary]]. | * [[http://www.iram.es/IRAMES/mainWiki/PoolS12 |Pool observers for the November 2012 run]] |
Line 158: | Line 149: |
==== Daily reports ==== * GismoRun7 |
* '''1st GISMO pool''' (April 2012) * [[http://www.iram.fr/php/rel_sched/bgfiles/12/bolopool-W11.html | List of accepted projects.]] |
Line 164: | Line 154: |
* '''5th alignment run''' (March 2012) * [[GismoRun5|Go to the 5th run Wiki page]] |
|
Line 165: | Line 158: |
=== 1st GISMO pool (April 2012) === In September 2011, GISMO had for the 1st time been offered to the community. Two weeks of dedicated GISMO observations have been carried out during April 2012. |
* '''4th test run''' (April 2011) |
Line 168: | Line 160: |
* [[GismoRun4|Go to the 4th run Wiki page]] | |
Line 169: | Line 162: |
==== Daily reports ==== | * '''3rd test run''' (April 2010) |
Line 171: | Line 164: |
* GismoRun6 | * [[GismoRun3|Go to the 3rd run Wiki page]] |
Line 173: | Line 166: |
* '''2nd test run''' (October 2008) | |
Line 174: | Line 168: |
==== Test plan ==== | * [[GismoRun2|Go to the 2nd run Wiki page]] |
Line 176: | Line 170: |
* TestPlan for the first days of the April run * GismoToDoList |
* '''1st test run''' (November 2007) |
Line 179: | Line 172: |
=== 5th alignment run, March 2012 === [[GismoRun5|Go to the 5th run Wiki page]] (installation of GISMO at a permanent position with new optics, baffle and new filter) === 4th test run, April 2011 === [[GismoRun4|Go to the 4th run Wiki page]] (restricted access, please send an email to SL to obtain the login information) === 3rd test run, April 2010 === [[GismoRun3|Go to the 3rd run Wiki page]] === 2nd test run, October 2008 === [[GismoRun2|Go to the 2nd run Wiki page]] === 1st test run, November 2007 === [[GismoRun1|Go to the 1st run Wiki page]] |
* [[GismoRun1|Go to the 1st run Wiki page]] |
Line 202: | Line 176: |
Author: Israel Hermelo (GISMO pool manager) | Author: Israel Hermelo (IRAM 30m Continuum Pool Manager) |
Line 206: | Line 180: |
Created: 2013.10.25 | Created: 2013.Oct.25 |
Line 208: | Line 182: |
This page is maintained by IH, CK, SL and the GISMO team Last update: 2013.10.25 |
Last update: 2014.Sep.30 |
GISMO
The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn.
Contents
Overview
GISMO consists of 8x16 pixels with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is centred at 2 mm (150 GHz). The is shown in Figure 1. Pixels are spaced by 13.75" and the telescope HPBW is 16.7". The sensitivity is about 14 mJy sqrt(sec) . The field-of-view is 1.8'x3.7' . Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8%. GISMO has been available to observers since the winter semester 2011/12.
|
Pixels |
Wavelength |
Bandwidth (FWHM) |
Sensitivity (out of atmosphere) |
HPBW |
Field-of-View |
Spacing |
GISMO |
8x16 |
2.0 mm |
140-162 GHz |
14 mJy*s1/2 |
16.7" |
1.8' x 3.7' |
13.75" |
The quoted sensitivity is the median sensitivity of the crush default reduction using the data of the pool runs of April 2012 and 2013. See the reports of Bruni et al. 2012 and Hermelo et al. 2013 below.
GISMO bandpass filter measured in the lab (transmission function extracted from 2mm_BP_angles_Jul06.xls of J.Staguhn, 31-Oct-2013)
The Point Spread Function of GISMO can be downloaded from the CRUSH web site.
Call for proposals
GISMO is offered again to the community the winter semester 2013/14:
Documentation and Publications
- Documentation
Report on GISMO performance based on the 5th pool run (April 2014).
Report on GISMO performance based on the 4th pool run (October/November 2013).
Report on GISMO performance based on the 3rd pool run (April 2013).
Report on GISMO performance based on the 2nd pool run (October/November 2012).
Report on GISMO performance based on the 1st pool run (April 2012).
GISMO Software Operational Manual by Steve Maher and Johannes Staguhn (Dec 2013)
GISMO NCS Software Interface and FITS File Description by Steve Maher, Attila Kovacs, Albrecht Sievers (Dec 2013)
- Publications
Staguhn et al. 2013 arXiv,
The GISMO 2-millimeter Deep Field in GOODS-NDwek, Staguhn et al. 2011 ApJ,
Star and dust formation activities in AzTEC-3: A starburst galaxy at z = 5.3Arendt et al. 2011 ApJ,
The Radio - 2 mm Spectral Index of the Crab Nebula Measured with GISMOCapack et al. 2011 Nature,
A massive proto-cluster of galaxies at a redshift of z~5.3Dicker et al. 2009 ApJ,
90GHz and 150GHz observations of the Orion M42 region. A sub-millimeter to radio analysisBenford, Moseley, Zmuidzinas 2009 Journal of Physics
Direct detectors for the Einstein inflation probeIRAM Newsletter 2/2009
GISMO - The Goddard-IRAM Superconducting 2 Millimeter Observer tested at the IRAM 30m observatoryStaguhn et al. 2008 Journal of Low Temperature Physics, 151, 3, 709
GISMO, a 2 mm Bolometer Camera Optimized for the Study of High Redshift Galaxies
Support teams
- Overall coordinator:
Samuel Leclercq (IRAM/Grenoble, <leclercq@iram.fr>)
- GISMO support team:
Johannes Staguhn (GISMO PI, <johannes.g.staguhn@nasa.gov>)
- Elmer Sharp
- Steve Maher
- Dale Fixen
- Attila Kovacs (crush)
- IRAM/Granada support team:
Carsten Kramer (Station Manager, <kramer@iram.es>)
Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>)
Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>)
Nicolas Billot (30m scheduler, <billot@iram.es>)
Albrecht Sievers (friend of GISMO, <sievers@iram.es>)
How-to's
Pool Preparation provides information on the observing modes offered for the continuum cameras as well as examples of the scripts that you need to prepare to observe your project.
Observing Session provides an example of a typical session with the continuum cameras at the 30m telescope.
Pointing sources and calibrators provides a list of pointing sources and calibrators for the IRAM 30m continuum cameras.
Data Reduction provides some basic examples to reduce GISMO data using CRUSH. For more detail please see the CRUSH documentation.
GISMO recycling guide provides instructions for operators and AoDs of the GISMO recycling.
6th GISMO pool (October 2014)
The 6th GISMO pool will take place from the 21st to the 28th of October 2014. Observations will be carried from a dedicated pool account (Israel Hermelo will provide login information).
Pool projects and observers
For information about the accepted projects and the observers at the 30m please go to:
Progress
The progress of the 6th GISMO pool can be followed via:
External GISMO Nexus log with slow updates
Internal GISMO Nexus log with fast updates
Previous observing runs
5th GISMO pool (April 2014)
4th GISMO pool (October/November 2013)
3rd GISMO pool (April 2013)
2nd GISMO pool (November 2012)
1st GISMO pool (April 2012)
5th alignment run (March 2012)
4th test run (April 2011)
3rd test run (April 2010)
2nd test run (October 2008)
1st test run (November 2007)
Author: Israel Hermelo (IRAM 30m Continuum Pool Manager)
email: hermelo@iram.es
Created: 2013.Oct.25
Last update: 2014.Sep.30