MAMBO2/ABBA2 Checklist

This document describe the checks and test that must be done before and during the Bolometer pool, as well as the frequency needed for these tests. (Maintained by GQ.)

The tests are divided into different groups, as they supposed to be carried by different groups of the IRAM staff (operators, AoDs, or Rxs)

AOD CHECKLIST

agreed by the pool coordinator of based in that no other projects can be observed at that moment.

BOLOMETER TEST CHECKLIST

This section details the test to be done with the bolometer, previous to the pool observations. Both general tests and particular session tests must be done. Also the Alignment test in case MAMBO has been reinstalled.

GENERAL TESTS:

ALIGNMENT TEST LIST:

TEST PRIOR TO POOL S09:

ABBA2 TEST CHECKLIST

This tests are required mainly if the ABBA2 version has changed.

Other ABBA issues

 vncviewer -shared mrt-abba:2 

<!> If ABBA2 needs to be rebooted, the ABBA2 software is initialized automatically. If two ABBA2 processes are running it will not work at all.

ABBA2 Labview versions

Version

Pool

Known problems

20090710a

PoolW0809

ABBA2 Chashes twice per day

20090812a

PoolS09

Sync. problems for skydips (25% lost), 1 crash per day

Some notes on Operator duties

<!> Remember to remove the cable from the box when He3 is recycled manually

Some notes on receiver engineer duties


USEFUL DOCUMENTATION


PROBLEMS AND SOLUTIONS

This is a quick guide through normal problems that appeared in the past and the possible reasons and solutions.