5142
Comment:
|
6183
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
* Any observer from a B-rated project has 4 hours of observation granted. But just this. Any increase of time has to be or agreed by the pool coordinator of based in that no other projects can be observed at that moment. |
|
Line 13: | Line 16: |
* When to switch to heterodyne * What is a spiky scan |
* When to switch to heterodyne ? * What is a spiky scan ? * What is a jump in signal ? |
Line 17: | Line 21: |
* Start the PoolGuide. * Do a backup of the DAFS ('''daily'''): GQ woking with RZ in a tool to do it automatically |
Do you know the answer to these questions? If not, ask the pool coordinator well in advance ( to avoid the problems to be not noticed) * Start the PoolGuide. (not now) |
Line 24: | Line 29: |
* Check the cable connections of ABBA ('''weekly''', or if ABBA does not react) | * Check the cable connections of ABBA (if ABBA does not react) * Monitors: Monitor, MonCoo, MonInst, MonitorLoop, MonitorList * Basic Mopsic Reduction: ooCSF, mapCSF,... * Database reduction: possible errors and how to solve them. |
Line 47: | Line 58: |
* The pointing corrections should similar than those before. | * If MAMBO2 has been reinstalled first a optical alignment must be done. |
Line 49: | Line 60: |
* The pointing corrections should be the same for different bolometers (e.g. 50 & 20) | * Do a pointing model. During night covering all the sky in az. and el. The coverage can be checked with the regular mopsic macros used to plot the pointing corrections. |
Line 51: | Line 62: |
* | * The pointing corrections should similar than those before. * The pointing corrections should be the same for different bolometers. Use the macros roff20, roff53, roff8, roff3 which are located in different regions of MAMBO. * The spillover in sources below some Jy should show two halves of a circle. However this pattern has not been seen for years. Nowadays the know-but-bad patter is ok, since we have not been able to get anything better (so far). |
MAMBO2/ABBA2 Checklist
This document describe the checks and test that must be done before and during the Bolometer pool, as well as the frequency needed for these tests. (Maintained by GQ.)
The tests are divided into different groups, as they supposed to be carried by different groups of the IRAM staff (operators, AoDs, or Rxs)
Contents
AOD CHECKLIST
- Any observer from a B-rated project has 4 hours of observation granted. But just this. Any increase of time has to be or
agreed by the pool coordinator of based in that no other projects can be observed at that moment.
Teach the observers on the general aspects of the observation even the expert MAMBO observers (weekly):
- When to switch to heterodyne ?
- What is a spiky scan ?
- What is a jump in signal ?
- Not to open a second monitor at flexible@mrt-lx3:monitor/
- Do you know the answer to these questions? If not, ask the pool coordinator well in advance ( to avoid the problems to be not noticed)
Start the PoolGuide. (not now)
Observations on absorber (AbsorberObs, at least once per week!)
- Do when the weather is too bad even for heterodyne observations.
- Do if the scans are too spiky
Do a Beam Map
- Check the cable connections of ABBA (if ABBA does not react)
Monitors: Monitor, MonCoo, MonInst, MonitorLoop, MonitorList
- Basic Mopsic Reduction: ooCSF, mapCSF,...
- Database reduction: possible errors and how to solve them.
BOLOMETER TEST CHECKLIST
This section details the test to be done with the bolometer, previous to the pool observations. Both general tests and particular session tests must be done. Also the Alignment test in case MAMBO has been reinstalled.
GENERAL TESTS:
Perform Skydips (discrete and slewed). Slewed skydips is still not working correctly
- Slew by ~270 degrees before doing a pointing.
Do absorber observations.
If weather is good and stable enough do a Beam Map
- Test the normal observing modes.
Test the PoolGuide tool and the online database reduction.
ALIGNMENT TEST LIST:
- If MAMBO2 has been reinstalled first a optical alignment must be done.
- Do a pointing model. During night covering all the sky in az. and el. The coverage can be checked with the regular mopsic macros used to plot the pointing corrections.
- The pointing corrections should similar than those before.
- The pointing corrections should be the same for different bolometers. Use the macros roff20, roff53, roff8, roff3 which are located in different regions of MAMBO.
- The spillover in sources below some Jy should show two halves of a circle. However this pattern has not been seen for years. Nowadays the know-but-bad patter is ok, since we have not been able to get anything better (so far).
TEST PRIOR TO POOL S09:
- Check if there is signal jumps. If so, change the ABBA2 version and check again.
- Beam stability tests. To check for the reasons on the elongation show in the deep field maps.
- Do on-off observations at 2 deg. from the sun to check its effects.
ABBA2 TEST CHECKLIST
This tests are required mainly if the ABBA2 version has changed.
- Verify that configuration changes works e.g. setting the gain. (e.g. pointing on a planet with different gains.)
- Change observing mode (i.e total power and wobbler switching
Offline stability test. ABBA offline tests
- Note that this tests only reproduce the 1-phase observations (i.e. total power).
Other ABBA issues
- How to open the ABBA2 monitor:
vncviewer -shared mrt-abba:2
If ABBA2 needs to be rebooted, the ABBA2 software is initialized automatically. If two ABBA2 processes are running it will not work at all.
Change to ABBA2 previous software version: SwitchAbbaSoftVersion
ABBA2 Labview versions
Version |
Pool |
Known problems |
20090710a |
ABBA2 Chashes twice per day |
|
20090812a |
Sync. problems for skydips (25% lost), 1 crash per day |
Some notes on Operator duties
- Check the bolometer temperature
- Check that the paddle motor works.
Fill the bolometer: https://gra-lx1.iram.es/mainWiki/BolometerCooldownInstructions
Remember to remove the cable from the box when He3 is recycled manually
Some notes on receiver engineer duties
- Check the resistance
- Check battery voltage
- Check the Bias voltage
Check the blank/sync Signal at ABBA2 with an oscilloscope. (During tests, and/or if strong spikes appear)
Check the analog signals after the preamplifier while covering the entrance window with a metal plate. (During tests, and/or if strong spikes appear)
USEFUL DOCUMENTATION
ABBA2 short description: abba2_short_description.pdf
ABBA2 cable conections: abba2.png
PROBLEMS AND SOLUTIONS
This is a quick guide through normal problems that appeared in the past and the possible reasons and solutions.
PROBLEM
REASON
SOLUTION
Bololog is not updated
goPool has not been sent
Ask the operator to do so
Mopsic Monitor is not working
There is other monitor running and the DAFS files have been corrupted
Stop the second monitor and recreate the DAFS
ABBA does not start getting data
Wobbler is not wobbling
Ask the operator
ABBA process (labview) do not start
Other Labview might be running
check the processes and kill all labviews
ABBA does not start getting data
Wobbler works fine but the signal did not reach ABBA
Check the cable connections with ABBA
The skydip results are abnormally high
The paddle is put in from of the beam
Ask the operator to try it by hand or contact the Rx people