| Size: 4869 Comment:  | Size: 5181 Comment:  | 
| Deletions are marked like this. | Additions are marked like this. | 
| Line 13: | Line 13: | 
| * When to switch to heterodyne * What is a spiky scan | * When to switch to heterodyne ? * What is a spiky scan ? * What is a jump in signal ? | 
| Line 17: | Line 18: | 
| * Start the PoolGuide. | |
| Line 28: | Line 30: | 
| Also the Alignment test in case MAMBO has been reinstalled. | |
| Line 42: | Line 45: | 
| ALIGNMENT TEST LIST: * The pointing corrections should similar than those before. * The pointing corrections should be the same for different bolometers (e.g. 50 & 20) * | 
MAMBO2/ABBA2 Checklist
This document describe the checks and test that must be done before and during the Bolometer pool, as well as the frequency needed for these tests. (Maintained by GQ.)
The tests are divided into different groups, as they supposed to be carried by different groups of the IRAM staff (operators, AoDs, or Rxs)
Contents
AOD CHECKLIST
- Teach the observers on the general aspects of the observation even the expert MAMBO observers (weekly): - When to switch to heterodyne ?
- What is a spiky scan ?
- What is a jump in signal ?
- Not to open a second monitor at flexible@mrt-lx3:monitor/
 
- Start the PoolGuide. 
- Do a backup of the DAFS (daily): GQ woking with RZ in a tool to do it automatically 
- Observations on absorber (AbsorberObs, at least once per week!) - Do when the weather is too bad even for heterodyne observations.
- Do if the scans are too spiky
 
- Do a Beam Map 
- Check the cable connections of ABBA (weekly, or if ABBA does not react) 
BOLOMETER TEST CHECKLIST
This section details the test to be done with the bolometer, previous to the pool observations. Both general tests and particular session tests must be done. Also the Alignment test in case MAMBO has been reinstalled.
GENERAL TESTS:
- Perform Skydips (discrete and slewed). Slewed skydips is still not working correctly 
- Slew by ~270 degrees before doing a pointing.
- Do absorber observations. 
- If weather is good and stable enough do a Beam Map 
- Test the normal observing modes.
- Test the PoolGuide tool and the online database reduction. 
ALIGNMENT TEST LIST:
- The pointing corrections should similar than those before.
- The pointing corrections should be the same for different bolometers (e.g. 50 & 20) 
TEST PRIOR TO POOL S09:
- Check if there is signal jumps. If so, change the ABBA2 version and check again.
- Beam stability tests. To check for the reasons on the elongation show in the deep field maps.
- Do on-off observations at 2 deg. from the sun to check its effects.
ABBA2 TEST CHECKLIST
This tests are required mainly if the ABBA2 version has changed.
- Verify that configuration changes works e.g. setting the gain. (e.g. pointing on a planet with different gains.)
- Change observing mode (i.e total power and wobbler switching
- Offline stability test. ABBA offline tests - Note that this tests only reproduce the 1-phase observations (i.e. total power).
 
Other ABBA issues
- How to open the ABBA2 monitor:
vncviewer -shared mrt-abba:2
 If ABBA2 needs to be rebooted, the ABBA2 software is initialized automatically. If two ABBA2 processes are running it will not work at all.
 If ABBA2 needs to be rebooted, the ABBA2 software is initialized automatically. If two ABBA2 processes are running it will not work at all. 
- Change to ABBA2 previous software version: SwitchAbbaSoftVersion 
ABBA2 Labview versions
| Version | Pool | Known problems | 
| 20090710a | ABBA2 Chashes twice per day | |
| 20090812a | Sync. problems for skydips (25% lost), 1 crash per day | 
Some notes on Operator duties
- Check the bolometer temperature
- Check that the paddle motor works.
- Fill the bolometer: https://gra-lx1.iram.es/mainWiki/BolometerCooldownInstructions 
 Remember to remove the cable from the box when He3 is recycled manually
 Remember to remove the cable from the box when He3 is recycled manually 
Some notes on receiver engineer duties
- Check the resistance
- Check battery voltage
- Check the Bias voltage
- Check the blank/sync Signal at ABBA2 with an oscilloscope. (During tests, and/or if strong spikes appear) 
- Check the analog signals after the preamplifier while covering the entrance window with a metal plate. (During tests, and/or if strong spikes appear) 
USEFUL DOCUMENTATION
- ABBA2 short description: abba2_short_description.pdf 
- ABBA2 cable conections: abba2.png 
PROBLEMS AND SOLUTIONS
This is a quick guide through normal problems that appeared in the past and the possible reasons and solutions.
- PROBLEM - REASON - SOLUTION - Bololog is not updated - goPool has not been sent - Ask the operator to do so - Mopsic Monitor is not working - There is other monitor running and the DAFS files have been corrupted - Stop the second monitor and recreate the DAFS - ABBA does not start getting data - Wobbler is not wobbling - Ask the operator - ABBA process (labview) do not start - Other Labview might be running - check the processes and kill all labviews - ABBA does not start getting data - Wobbler works fine but the signal did not reach ABBA - Check the cable connections with ABBA - The skydip results are abnormally high - The paddle is put in from of the beam - Ask the operator to try it by hand or contact the Rx people 