Differences between revisions 34 and 35
Revision 34 as of 2009-09-17 12:15:06
Size: 3303
Editor: gra-lx17
Comment:
Revision 35 as of 2009-09-17 12:16:03
Size: 3310
Editor: gra-lx17
Comment:
Deletions are marked like this. Additions are marked like this.
Line 36: Line 36:
= Other ABBA issues = ==== Other ABBA issues =====

MAMBO2/ABBA2 Checklist

This document describe the checks and test that must be done before and during the Bolometer pool, as well as the frequency needed for these tests. (Maintained by GQ.)

The tests are divided into different groups, as they supposed to be carried by different groups of the IRAM staff (operators, AoDs, or Rxs)

AOD CHECKLIST

  • Teach the observers on the general aspects of the observation even the expert MAMBO observers (weekly):

    • CookbookPako.

    • When to switch to heterodyne
    • What is a spiky scan
    • Not to open a second monitor at flexible@mrt-lx3:monitor/
  • Do a backup of the DAFS (daily): GQ woking with RZ in a tool to do it automatically

  • Observations on absorber (AbsorberObs, at least once per week!)

    • Do when the weather is too bad even for heterodyne observations.
    • Do if the scans are too spiky
  • Do a Beam Map

  • Check the cable connections of ABBA (weekly, or if ABBA does not react)

BOLOMETER TEST CHECKLIST

This section details the test to be done with the bolometer, previous to the pool observations.

ABBA2 TEST CHELIST

  • Offline stability test. ABBA offline tests

    • Note that this tests only reproduce the 1-phase observations (i.e. total power).

==== Other ABBA issues =====

  • How to open the ABBA2 monitor:

 vncviewer -shared mrt-abba:2 

Some notes on Operator duties

<!> Remember to remove the cable from the box when He3 is recycled manually

Some notes on receiver engineer duties

  • Check the resistance
  • Check battery voltage
  • Check the Bias voltage
  • Check the blank/sync Signal at ABBA2 with an oscilloscope. (During tests, and/or if strong spikes appear)

  • Check the analog signals after the preamplifier while covering the entrance window with a metal plate. (During tests, and/or if strong spikes appear)


USEFUL DOCUMENTATION


PROBLEMS AND SOLUTIONS

This is a quick guide through normal problems that appeared in the past and the possible reasons and solutions.

  • PROBLEM

    REASON

    SOLUTION

    Bololog is not updated

    goPool has not been sent

    Ask the operator to do so

    Mopsic Monitor is not working

    There is other monitor running and the DAFS files have been corrupted

    Stop the second monitor and recreate the DAFS

    ABBA does not start getting data

    Wobbler is not wobbling

    Ask the operator

    ABBA does not start getting data

    Wobbler works fine but the signal did not reach ABBA

    Check the cable connections with ABBA

    The skydip results are abnormally high

    The paddle is put in from of the beam

    Ask the operator to try it by hand or contact the Rx people

BoloChkList (last edited 2011-05-30 15:13:12 by lt-ck)