2011
Comment:
|
2679
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
=== OPERATOR CHECKLIST === * Bolometer temperature * Check that the paddle motor works. |
|
Line 22: | Line 15: |
* Do a backup of the DAFS ('''daily''') * Observations on absorber ((AbsorberObs, '''at least once per week!''') |
* Do a backup of the DAFS ('''daily'''): GQ woking with RZ in a tool to do it automatically * Observations on absorber (AbsorberObs, '''at least once per week!''') |
Line 27: | Line 20: |
=== RXs CHECKLIST === | * Check the cable connections of ABBA ('''weekly''', or if ABBA does not react) === Some notes on Operator duties === * Check the bolometer temperature * Check that the paddle motor works. * Fill the bolometer: https://gra-lx1.iram.es/mainWiki/BolometerCooldownInstructions <!> Remember to remove the cable from the box when He3 is recycled manually === Some notes on receiver engineer duties === |
Line 34: | Line 37: |
* Check the analog signals after the preamplifier while covering the entrance window with a metal plate. ('''During tests, and/or if strong spikes appear''') ---- === USEFUL DOCUMENTATION === * ABBA short description: [[attachment:abba2_short_description.pdf]] * ABBA cable conections: [[attachment:abba2.png]] |
MAMBO2/ABBA2 Checklist
This document describe the checks and test that must be done before and during the Bolometer pool, as well as the frequency needed for these tests. (Maintained by GQ.)
The tests are divided into different groups, as they supposed to be carried by different groups of the IRAM staff (operators, AoDs, or Rxs)
AOD CHECKLIST
Teach the observers on the general aspects of the observation even the expert MAMBO observers (weekly):
- When to switch to heterodyne
- What is a spiky scan
- Not to open a second monitor at flexible@mrt-lx3:monitor/
Do a backup of the DAFS (daily): GQ woking with RZ in a tool to do it automatically
Observations on absorber (AbsorberObs, at least once per week!)
- Do when the weather is too bad even for heterodyne observations.
- Do if the scans are too spiky
Check the cable connections of ABBA (weekly, or if ABBA does not react)
Some notes on Operator duties
- Check the bolometer temperature
- Check that the paddle motor works.
Fill the bolometer: https://gra-lx1.iram.es/mainWiki/BolometerCooldownInstructions
Remember to remove the cable from the box when He3 is recycled manually
Some notes on receiver engineer duties
- Check the resistance
- Check battery voltage
- Check the Bias voltage
Check the blank/sync Signal at ABBA with an oscilloscope. (During tests, and/or if strong spikes appear)
Check the analog signals after the preamplifier while covering the entrance window with a metal plate. (During tests, and/or if strong spikes appear)
USEFUL DOCUMENTATION
ABBA short description: abba2_short_description.pdf
ABBA cable conections: abba2.png
PROBLEMS AND SOLUTIONS
This is a quick guide through normal problems that appeared in the past and the possible reasons and solutions.
PROBLEM
REASON
SOLUTION
Bololog is not updated
goPool has not been sent
Ask the operator to do so
Mopsic Monitor is not working
There is other monitor running and the DAFS files have been corrupted
Stop the second monitor and recreate the DAFS
ABBA does not start getting data
Wobbler is not wobbling
Ask the operator
ABBA does not start getting data
Wobbler works fine but the signal did not reach ABBA
Check the cable connections with ABBA
The skydip results are abnormally high
The paddle is put in from of the beam
Ask the operator to try it by hand or contact the Rx people