| Size: 2011 Comment:  | Size: 2346 Comment:  | 
| Deletions are marked like this. | Additions are marked like this. | 
| Line 10: | Line 10: | 
| * Bolometer temperature | * Check the bolometer temperature | 
| Line 12: | Line 12: | 
| * Fill the bolometer:[https://gra-lx1.iram.es/mainWiki/BolometerCooldownInstructions] | |
| Line 13: | Line 14: | 
| <!> Remember to remove the cable from the box when He3 is recycled manually | |
| Line 34: | Line 36: | 
| * Check the analog signals after the preamplifier while covering the entrance window with a metal plate. ('''During tests, and/or if strong spikes appear''') | 
MAMBO2/ABBA2 Checklist
This document describe the checks and test that must be done before and during the Bolometer pool, as well as the frequency needed for these tests. (Maintained by GQ.)
The tests are divided into different groups, as they supposed to be carried by different groups of the IRAM staff (operators, AoDs, or Rxs)
OPERATOR CHECKLIST
- Check the bolometer temperature
- Check that the paddle motor works.
- Fill the bolometer:[https://gra-lx1.iram.es/mainWiki/BolometerCooldownInstructions] 
 Remember to remove the cable from the box when He3 is recycled manually
 Remember to remove the cable from the box when He3 is recycled manually 
AOD CHECKLIST
- Teach the observers on the general aspects of the observation even the expert MAMBO observers (weekly): - When to switch to heterodyne
- What is a spiky scan
- Not to open a second monitor at flexible@mrt-lx3:monitor/
 
- Do a backup of the DAFS (daily) 
- Observations on absorber ((AbsorberObs, at least once per week!) - Do when the weather is too bad even for heterodyne observations.
- Do if the scans are too spiky
 
RXs CHECKLIST
- Check the resistance
- Check battery voltage
- Check the Bias voltage
- Check the blank/sync Signal at ABBA with an oscilloscope. (During tests, and/or if strong spikes appear) 
- Check the analog signals after the preamplifier while covering the entrance window with a metal plate. (During tests, and/or if strong spikes appear) 
PROBLEMS AND SOLUTIONS
This is a quick guide through normal problems that appeared in the past and the possible reasons and solutions.
- PROBLEM - REASON - SOLUTION - Bololog is not updated - goPool has not been sent - Ask the operator to do so - Mopsic Monitor is not working - There is other monitor running and the DAFS files have been corrupted - Stop the second monitor and recreate the DAFS - ABBA does not start getting data - Wobbler is not wobbling - Ask the operator - ABBA does not start getting data - Wobbler works fine but the signal did not reach ABBA - Check the cable connections with ABBA - The skydip results are abnormally high - The paddle is put in from of the beam - Ask the operator to try it by hand or contact the Rx people 