Size: 5200
Comment:
|
Size: 5955
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 28: | Line 28: |
21; 24.-31-05; A. Bongiovanni; telescope shutdown for on-site upgrade works by first June; | 21; 24.-31-05; A. Bongiovanni; shutdown for on-site upgrade works by first June (postponed to 2023); 22; 27.05-07.06; G. Paubert; holography + wobbler tests + pointing model checks + polarimetry ToO TBC (087-21). Support from SA, PT, IM; 23; 07.-14.06; P. Torné + M. Sánchez (Tuesday afternoon); S. Amarantidis training; 24; 14.-21.06; B. Mancillas; S. Amarantidis training; 25; 21.-27.06; A. Bongiovanni; S. Amarantidis training; 26; 27.06-05.07; M. Sánchez + G. Paubert; 27; 05.-12.07; I. Myserlis; S. Amarantidis training; 28; 12.-19.07; A. Sievers; 29; 19.-26.07; G. Paubert; 30; 26.07-02.08; S. Amarantidis; 31; 02.-09.08; B. Mancillas; EMIR Pool #1 32; 09.-16.08; S. Amarantidis (Tue-Fri) + B. Mancillas (Fri-Tue); 33; 16.-23.08; P. Torné; 34; 23.-30.08; M. Sánchez + G. Paubert (Mon-Fri), I. Myserlis (Fri-Tue); 35; |
2022
2021
Previous AoD Plans 2008-2020:
AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111
AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
---