Size: 5187
Comment:
|
Size: 7451
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
= 2023 = {{{ #!CSV ;;;; 01; 03.-10.01; B. Mancillas; HET Pool #1; 02; 10.-17.01; A. Bongiovanni + M. Sánchez (EMIR backup); NIKA2 Pool #2; 03; 17.-24.01; I. Myserlis + M. Sánchez (EMIR backup); NIKA2 Pool #3; 04; 24.-31.01; S. Amarantidis + M. Sánchez (EMIR backup); NIKA2 Pool #4; 05; 31.01-07.02; G. Paubert; 06; 07.14.02; P. Torné; }}} |
|
Line 11: | Line 26: |
04; 25.01-01.02; M. Rodríguez + B. Mancillas + P. Torné (ETH DR); Winter HET Pool #1 + EHT DR; | 04; 25.01-01.02; M. Rodríguez + B. Mancillas + P. Torné (EHT DR); Winter HET Pool #1 + EHT DR; |
Line 18: | Line 33: |
11; 15.-22.03; M. Rodríguez + P. Torné (ETH) + M. Sánchez; Winter HET Pool #2. EHT slot start on 17 March throughout 28; 12; 22.-29.03; B. Mancillas + P. Torné (ETH) + M. Sánchez; Winter HET Pool #3. EHT slot start on 17 March throughout 28; |
11; 15.-22.03; M. Rodríguez + P. Torné (EHT) + M. Sánchez; Winter HET Pool #2. EHT slot start on 17 March throughout 28; 12; 22.-29.03; B. Mancillas + P. Torné (EHT) + M. Sánchez; Winter HET Pool #3. EHT slot start on 17 March throughout 28; |
Line 24: | Line 39: |
17; 26.04-03.05; I. Myserlis (remote AOD) + M. Sánchez; telescope shutdown postponed to beginning of June; 18; 03.-10.05; B. Mancillas + TBC (remote); Winter HET Pool #4; |
17; 26.04-03.05; I. Myserlis (remote AOD) ; telescope shutdown postponed to beginning of June; 18; 03.-10.05; B. Mancillas + M. Sánchez (remote); Winter HET Pool #4; |
Line 27: | Line 42: |
20; 17.-24.05; B. Mancillas + M. Rodríguez (part time, remote); M. Rodríguez unavailable 19, 20, 21 May; 21; 24.-31-05; TBC; telescope shutdown for on-site upgrade works by first June; |
20; 17.-24.05; B. Mancillas + M. Sánchez (remote); Winter HET Pool #5. M. Rodríguez unavailable 19, 20, 21 May; 21; 24.-31-05; A. Bongiovanni; shutdown for on-site upgrade works by first June (postponed to 2023); 22; 27.05-07.06; G. Paubert; holography + wobbler tests + pointing model checks + polarimetry ToO TBC (087-21). Support from SA, PT, IM; 23; 07.-14.06; P. Torné + M. Sánchez (Tuesday afternoon); S. Amarantidis training; 24; 14.-21.06; B. Mancillas; S. Amarantidis training; 25; 21.-27.06; A. Bongiovanni; S. Amarantidis training; 26; 27.06-05.07; M. Sánchez + G. Paubert; 27; 05.-12.07; I. Myserlis; S. Amarantidis training; 28; 12.-19.07; A. Sievers; 29; 19.-26.07; G. Paubert; 30; 26.07-02.08; S. Amarantidis; 31; 02.-09.08; B. Mancillas; EMIR Pool #1 32; 09.-16.08; S. Amarantidis (Tue-Fri) + B. Mancillas (Fri-Tue); remote AOD; 33; 16.-23.08; P. Torné; remote AOD; 34; 23.-30.08; M. Sánchez (Mon-Sat) + G. Paubert (Mon-Fri), I. Myserlis (Sun-Tue, remote); 35; 30.08-06.09; A. Sievers; 36; 06.-13.09; B. Mancillas; EMIR Pool #2; 37; 13.-20.09; I. Myserlis; 38; 20.-27.09; B. Mancillas; EMIR Pool #3; 39; 27.09-04.10; S. Amarantidis; 40; 04.-10.10; P. Torné; GMVA fall session from 06. to 10.10; 41; 10.-18.10; A. Bongiovanni + S. Amarantidis (training) + M. Sánchez (EMIR backup); NIKA2 Pool #1; 42; 18.-25.10; I. Myserlis + S. Amarantidis (training) + M. Sánchez (EMIR backup); NIKA2 Pool #2; 43; 25.10-01.11; A. Bongiovanni + S. Amarantidis (training) + M. Sánchez (EMIR backup); NIKA2 Pool #3; 44; 01.-08.11; A. Sievers; 45; 08.-15.11; I. Myserlis + M. Sánchez (EMIR backup); NIKA2 Pool #4; 46; 15.-22.11; S. Amarantidis + M. Sánchez (EMIR backup); NIKA2 Pool #5; 47; 22.-29.11; A. Bongiovanni + M. Sánchez (EMIR backup); NIKA2 Pool #6. FPT test with P. Torné; 48; 29.11-06.12; G. Paubert; Holo campaign. P. Torné will join for the holo; 49; 06.-13.12; S. Amarantidis + M. Sánchez (EMIR backup); NIKA2 Winter Pool #1; 50; 13.-20.12; B. Mancillas; 51; 20.-27.11; P. Torné; 52; 27.12-03.01; A. Sievers; |
Line 82: | Line 128: |
47; 23.-30.11; I. Myserlis + M. Sánchez (EMIR backup); Summer NIKA2 Pool #4; | 47; 23.-30.11; I. Myserlis + M. Sánchez (EMIR backup); Summer NIKA2 Pool #4 ; |
Line 94: | Line 140: |
Previous AoD Plans 2008-2020: | Previous AoD Plans 2008-2021: |
Line 96: | Line 142: |
* AodSchedule21 |
2023
2022
2021
Previous AoD Plans 2008-2021:
AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111
AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
---