Size: 4848
Comment:
|
Size: 5759
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 24: | Line 24: |
17; 26.04-03.05; I. Myserlis (remote AOD) + M. Sánchez; telescope shutdown on 2 or 3 May for on-site upgrade works; | 17; 26.04-03.05; I. Myserlis (remote AOD) ; telescope shutdown postponed to beginning of June; 18; 03.-10.05; B. Mancillas + M. Sánchez (remote); Winter HET Pool #4; 19; 10.-17.05; A. Sievers + M. Sánchez (remote); A. Sievers unavailable second half of May; 20; 17.-24.05; B. Mancillas + M. Sánchez (remote); Winter HET Pool #5. M. Rodríguez unavailable 19, 20, 21 May; 21; 24.-31-05; A. Bongiovanni; telescope shutdown for on-site upgrade works by first June; 22; 27.05-07.06; G. Paubert; holography + wobbler tests + pointing model checks + polarimetry ToO TBC (087-21). Support from SA, PT, IM; 23; 07.-14.06; P. Torné + M. Sánchez (Tuesday afternoon); S. Amarantidis training; 24; 14.-21.06; B. Mancillas; S. Amarantidis training; 25; 21.-27.06; A. Bongiovanni; S. Amarantidis training; 26; 27.06-05.07; M. Sánchez + G. Paubert; 27; 05.-12.07; I. Myserlis; S. Amarantidis training; 28; 12.-19.07; A. Sievers; 29; 19.-26.07; G. Paubert; 30; 26.07-02.08; S. Amarantidis; 30; 26.07-02.08; B. Mancillas; |
2022
2021
Previous AoD Plans 2008-2020:
AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111
AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
---