Differences between revisions 1 and 158 (spanning 157 versions)
Revision 1 as of 2017-01-12 10:00:34
Size: 1551
Editor: PabloMellado
Comment:
Revision 158 as of 2020-01-22 18:10:50
Size: 1368
Editor: msanchez
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
= 2017 = = 2020 =
Line 8: Line 8:
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot;
6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot;
7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot;
8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week;
9; 28.2.-7.3.;G.Paubert (remote from Granada);;
10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline;
12; 21.-28.3.;P.Garcia;;
13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
22; 30.5.-6.6.;;;
}}}
01; 31.12-07.01; A. Bongiovanni;
02; 07.-14.01; G. Paubert;
03; 14.-21.01; B. Ladjelate ; NIKA2 Pool #2 - training of AB and IM cancelled for several reasons;
04; 21.-28.01; M. Rodriguez ; HET Pool #1 + EHT dress rehearsal (21-24);
05; 28.01-04.02; B. Ladjelate + A. Bongiovanni + I. Myserlis (Tue-Thurs); NIKA2 Pool #3;
06; 04.-11.02; M. Rodriguez + I. Myserlis; HET Pool #2
07; 11.-18.02; B. Ladjelate; NIKA2 Pool #4;
08; 18.-25.02; A. Sievers ;
09; 25.02-03.03; A. Bongiovanni (supported by A. Ritacco) + I. Myserlis ; NIKA2 polarimetry commissioning;
10; 03.-10.03; G. Paubert;
11; 10.-17.03; B. Ladjelate; NIKA2 Pool #5;
12; 17.-24.03; A. Sievers;
13; 24.-31.03; W. Kim (until 29.03) + M. Rodriguez (up on 30.03) + I. Myserlis ; HET Pool #3;
14; 31.03-07.04; M. Rodriguez; HET Pool #4;
15; 07.-14.04; I. Myserlis; TBD;
}}}
Line 32: Line 25:
Old AoD Plans: Previous AoD Plans 2008-2019:

 * AodSchedule19
 * AodSchedule18
 * AodSchedule17
Line 42: Line 39:

---

2020

01 31.12-07.01 A. Bongiovanni
02 07.-14.01 G. Paubert
03 14.-21.01 B. Ladjelate NIKA2 Pool #2 - training of AB and IM cancelled for several reasons
04 21.-28.01 M. Rodriguez HET Pool #1 + EHT dress rehearsal (21-24)
05 28.01-04.02 B. Ladjelate + A. Bongiovanni + I. Myserlis (Tue-Thurs) NIKA2 Pool #3
06 04.-11.02 M. Rodriguez + I. Myserlis HET Pool #2
07 11.-18.02 B. Ladjelate NIKA2 Pool #4
08 18.-25.02 A. Sievers
09 25.02-03.03 A. Bongiovanni (supported by A. Ritacco) + I. Myserlis NIKA2 polarimetry commissioning
10 03.-10.03 G. Paubert
11 10.-17.03 B. Ladjelate NIKA2 Pool #5
12 17.-24.03 A. Sievers
13 24.-31.03 W. Kim (until 29.03) + M. Rodriguez (up on 30.03) + I. Myserlis HET Pool #3
14 31.03-07.04 M. Rodriguez HET Pool #4
15 07.-14.04 I. Myserlis TBD

Previous AoD Plans 2008-2019:

---

AstronomersOnDutySchedule (last edited 2025-04-23 09:26:50 by msanchez)