Differences between revisions 9 and 10
Revision 9 as of 2007-09-14 08:10:46
Size: 931
Editor: lt-sl
Comment:
Revision 10 as of 2007-09-14 08:17:27
Size: 1143
Editor: lt-sl
Comment:
Deletions are marked like this. Additions are marked like this.
Line 33: Line 33:
Bolometer Tests (Phase Time=0.26s)
The wobbler throw fit is taken
04.09.2007
Bolometer Tests [[BR]]
The wobbler throw fit is taken from the pointing reduction with mopsic [[BR]]
04.09.2007 [[BR]]

tphase=0.26 [default]
Line 39: Line 41:
182 50/30/60 182 50/30/60 47.7
183 60/30/60 56.0
184 70/45/90 69.4
185 80/45/90 78.1
186 90/45/90 86.9
187 120/60/120 119.5 [tphase=0.4]
Line 41: Line 48:

{{{

}}}

Wobbler Thorw

Double-beam pointing with heterodyne and bolometer to check the effective throw vs. the commanded one.

TableOfContents

Back to MamboWebPage

Observations

NOTE for pako/Hetrodyne

Use pakodev

pako> set priv staff
pako> swwobbler -XX XX
pako> pointing /double

To get the wobbler throw with MIRA

MIRA> let dopause yes

The wobbler throw fitted depends of the Wobbler phase and the velocity speed. The wobbler throw commanded is corrected of that dependence.

Tests: BR Wobbler Throws (arcsec): 30, 40, 50, 60, 70, 80, 90, 120 (Het.) BR Integ. Time (s)/Length (arcsec): 30/60, 30/90, 30/120, 30/150, 20/120, 20/140, 20/160 BR

Results

Bolometer Tests BR The wobbler throw fit is taken from the pointing reduction with mopsic BR 04.09.2007 BR

tphase=0.26 [default]

Scan  CommandedWobbler/IntegrationTime/Length    ActualWobbler

182  50/30/60   47.7
183  60/30/60   56.0
184  70/45/90   69.4
185  80/45/90   78.1
186  90/45/90   86.9   
187  120/60/120 119.5 [tphase=0.4]

testMambo-20070904 (last edited 2009-04-16 08:26:33 by localhost)