Size: 931
Comment:
|
Size: 1143
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 33: | Line 33: |
Bolometer Tests (Phase Time=0.26s) The wobbler throw fit is taken 04.09.2007 |
Bolometer Tests [[BR]] The wobbler throw fit is taken from the pointing reduction with mopsic [[BR]] 04.09.2007 [[BR]] tphase=0.26 [default] |
Line 39: | Line 41: |
182 50/30/60 | 182 50/30/60 47.7 183 60/30/60 56.0 184 70/45/90 69.4 185 80/45/90 78.1 186 90/45/90 86.9 187 120/60/120 119.5 [tphase=0.4] |
Line 41: | Line 48: |
{{{ }}} |
Wobbler Thorw
Double-beam pointing with heterodyne and bolometer to check the effective throw vs. the commanded one.
Back to MamboWebPage
Observations
NOTE for pako/Hetrodyne
Use pakodev pako> set priv staff pako> swwobbler -XX XX pako> pointing /double
To get the wobbler throw with MIRA
MIRA> let dopause yes
The wobbler throw fitted depends of the Wobbler phase and the velocity speed. The wobbler throw commanded is corrected of that dependence.
Tests: BR Wobbler Throws (arcsec): 30, 40, 50, 60, 70, 80, 90, 120 (Het.) BR Integ. Time (s)/Length (arcsec): 30/60, 30/90, 30/120, 30/150, 20/120, 20/140, 20/160 BR
Results
Bolometer Tests BR The wobbler throw fit is taken from the pointing reduction with mopsic BR 04.09.2007 BR
tphase=0.26 [default]
Scan CommandedWobbler/IntegrationTime/Length ActualWobbler 182 50/30/60 47.7 183 60/30/60 56.0 184 70/45/90 69.4 185 80/45/90 78.1 186 90/45/90 86.9 187 120/60/120 119.5 [tphase=0.4]