Differences between revisions 8 and 9
Revision 8 as of 2007-09-05 21:26:53
Size: 753
Comment:
Revision 9 as of 2007-09-14 08:10:46
Size: 931
Editor: lt-sl
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:

Bolometer Tests (Phase Time=0.26s)
The wobbler throw fit is taken
04.09.2007
{{{
Scan CommandedWobbler/IntegrationTime/Length ActualWobbler

182 50/30/60
}}}

Wobbler Thorw

Double-beam pointing with heterodyne and bolometer to check the effective throw vs. the commanded one.

TableOfContents

Back to MamboWebPage

Observations

NOTE for pako/Hetrodyne

Use pakodev

pako> set priv staff
pako> swwobbler -XX XX
pako> pointing /double

To get the wobbler throw with MIRA

MIRA> let dopause yes

The wobbler throw fitted depends of the Wobbler phase and the velocity speed. The wobbler throw commanded is corrected of that dependence.

Tests: BR Wobbler Throws (arcsec): 30, 40, 50, 60, 70, 80, 90, 120 (Het.) BR Integ. Time (s)/Length (arcsec): 30/60, 30/90, 30/120, 30/150, 20/120, 20/140, 20/160 BR

Results

Bolometer Tests (Phase Time=0.26s) The wobbler throw fit is taken 04.09.2007

Scan  CommandedWobbler/IntegrationTime/Length    ActualWobbler

182  50/30/60   

testMambo-20070904 (last edited 2009-04-16 08:26:33 by localhost)