Differences between revisions 4 and 5
Revision 4 as of 2007-08-22 10:23:49
Size: 543
Editor: lt-sl
Comment:
Revision 5 as of 2007-09-04 17:37:11
Size: 707
Editor: lt-sl
Comment:
Deletions are marked like this. Additions are marked like this.
Line 25: Line 25:


Tests:
Wobbler Throws (arcsec): 30, 40, 50, 60, 70, 80, 90, 120 (Het.)
Integ. Time (s)/Length (arcsec): 30/60, 30/90, 30/120, 30/150, 20/120, 20/140, 20/160

Wobbler Thorw

Double-beam pointing with heterodyne and bolometer to check the effective throw vs. the commanded one.

TableOfContents

Back to MamboWebPage

Observations

NOTE for pako/Hetrodyne

Use pakodev

pako> set priv staff
pako> swwobbler -XX XX
pako> pointing /double

To get the wobbler throw with MIRA

MIRA> let dopause yes

The wobbler throw fitted depends of the Wobbler phase and the velocity speed. The wobbler throw commanded is corrected of that dependence.

Tests: Wobbler Throws (arcsec): 30, 40, 50, 60, 70, 80, 90, 120 (Het.) Integ. Time (s)/Length (arcsec): 30/60, 30/90, 30/120, 30/150, 20/120, 20/140, 20/160

testMambo-20070904 (last edited 2009-04-16 08:26:33 by localhost)