Size: 1347
Comment:
|
Size: 1680
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 60: | Line 60: |
{{{ 195 30/30/120 27.7 196 40/30/120 38.8 197 50/30/120 49.8 198 60/30/120 58.7 199 70/30/120 65.8 200 80/30/120 79.1 201 90/30/120 90.4 }}} {{{ 202 30/30/150 27.7 203 40/30/150 38.6 204 50/30/150 46.6 205 60/30/150 58.6 206 70/30/150 68.3 207 80/30/150 77.9 208 90/30/150 87.1 }}} |
Wobbler Thorw
Double-beam pointing with heterodyne and bolometer to check the effective throw vs. the commanded one.
Back to MamboWebPage
Observations
NOTE for pako/Hetrodyne
Use pakodev pako> set priv staff pako> swwobbler -XX XX pako> pointing /double
To get the wobbler throw with MIRA
MIRA> let dopause yes
The wobbler throw fitted depends of the Wobbler phase and the velocity speed. The wobbler throw commanded is corrected of that dependence.
Tests: BR Wobbler Throws (arcsec): 30, 40, 50, 60, 70, 80, 90, 120 (Het.) BR Integ. Time (s)/Length (arcsec): 30/60, 30/90, 30/120, 30/150, 20/120, 20/140, 20/160 BR
Results
04.09.2007 BR Bolometer Tests BR The wobbler throw fit is taken from the pointing reduction with mopsic BR
tphase=0.26 [default]
Scan CommandedWobbler/IntegrationTime/Length ActualWobbler (arcsec/sec/arcsec) (arcsec)
182 50/30/60 47.7 183 60/30/60 56.0 184 70/45/90 69.4 185 80/45/90 78.1 186 90/45/90 86.9 187 120/60/120 119.5 [tphase=0.4]
188 30/30/90 28. 189 40/30/90 39.7 190 50/30/90 48.5 191 60/30/90 57.7 192 70/30/90 67.9 193 80/30/90 79.4 194 90/30/90 89.4
195 30/30/120 27.7 196 40/30/120 38.8 197 50/30/120 49.8 198 60/30/120 58.7 199 70/30/120 65.8 200 80/30/120 79.1 201 90/30/120 90.4
202 30/30/150 27.7 203 40/30/150 38.6 204 50/30/150 46.6 205 60/30/150 58.6 206 70/30/150 68.3 207 80/30/150 77.9 208 90/30/150 87.1