Differences between revisions 10 and 11
Revision 10 as of 2007-09-14 08:17:27
Size: 1143
Editor: lt-sl
Comment:
Revision 11 as of 2007-09-14 08:22:34
Size: 1337
Editor: lt-sl
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
'''04.09.2007''' [[BR]]
Line 35: Line 35:
04.09.2007 [[BR]]
Line 40: Line 40:
      (arcsec/sec/arcsec) (arcsec)
Line 50: Line 50:
188 30/30/90 28.
189 40/30/90 39.7
190 50/30/90 48.5
191 60/30/90 57.7
192 70/30/90 67.9
193 80/30/90 79.4
194 90/30/90 89.4

Wobbler Thorw

Double-beam pointing with heterodyne and bolometer to check the effective throw vs. the commanded one.

TableOfContents

Back to MamboWebPage

Observations

NOTE for pako/Hetrodyne

Use pakodev

pako> set priv staff
pako> swwobbler -XX XX
pako> pointing /double

To get the wobbler throw with MIRA

MIRA> let dopause yes

The wobbler throw fitted depends of the Wobbler phase and the velocity speed. The wobbler throw commanded is corrected of that dependence.

Tests: BR Wobbler Throws (arcsec): 30, 40, 50, 60, 70, 80, 90, 120 (Het.) BR Integ. Time (s)/Length (arcsec): 30/60, 30/90, 30/120, 30/150, 20/120, 20/140, 20/160 BR

Results

04.09.2007 BR Bolometer Tests BR The wobbler throw fit is taken from the pointing reduction with mopsic BR

tphase=0.26 [default]

Scan  CommandedWobbler/IntegrationTime/Length    ActualWobbler
      (arcsec/sec/arcsec)    (arcsec)
182  50/30/60   47.7
183  60/30/60   56.0
184  70/45/90   69.4
185  80/45/90   78.1
186  90/45/90   86.9   
187  120/60/120 119.5 [tphase=0.4]

188  30/30/90   28.
189  40/30/90   39.7
190  50/30/90   48.5
191  60/30/90   57.7
192  70/30/90   67.9
193  80/30/90   79.4
194  90/30/90   89.4

testMambo-20070904 (last edited 2009-04-16 08:26:33 by localhost)