Tests performed during the heavy maintenance (2007.06.20)

TableOfContents

Goals

Identify the origin(s) of the "acceleration" problem in MAMBO2.

People

Pico Veleta: DJ, SL, SN, JP

Methods

attachment:inclinometerPhoto.jpg


Results

BR attachment:inclinometerBolo.jpg

BR Cascade controller attachment:scan47-elev-cascade.jpg


Basic controller attachment:scan50-elev-basic.jpg


attachment:scan51.jpg


No correlation was found between the beginning of the scans where the extra noise peaks appeared and the electric activity. A peak frequency of 5 sec was observed but which may be related to the air conditioned system.

Conclusions