Tests performed during the heavy maintenance (2007.06.20)
Goals
Identify the origin(s) of the "acceleration" problem in MAMBO2
People
Pico Veleta: DJ, SL, SN, JP
Methods
Inclinometer installed on the Mambo2 platform
attachment:inclinometerPhoto.jpg
Results
inclinometer measurements for two on-off measurements with the Cascade and the Basic controller. attachment:inclinometerBolo.jpg
scan51 with an extra weight on the bolometer weight, attachment:scan51.jpg