Size: 168
Comment:
|
Size: 383
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Tests performed during the heavy maintenance. | Tests performed during the heavy maintenance (2007.06.20) [[TableOfContents]] === Goals === Identify the origin(s) of the "acceleration" problem in MAMBO2 === People === |
Line 4: | Line 12: |
Goals: Identify the origin(s) of the "acceleration" problem in MAMBO2 [[BR]] People: DJ, SL, SN, JP |
Pico Veleta: DJ, SL, SN, JP |
Line 9: | Line 16: |
Methods | === Methods === Inclinometer installed on the Mambo2 platform attachment:inclinometerPhoto.jpg === Results === attachment:inclinometerBolo.jpg |
Tests performed during the heavy maintenance (2007.06.20)
Goals
Identify the origin(s) of the "acceleration" problem in MAMBO2
People
Pico Veleta: DJ, SL, SN, JP
Methods
Inclinometer installed on the Mambo2 platform
attachment:inclinometerPhoto.jpg
Results
attachment:inclinometerBolo.jpg