|
Size: 75
Comment:
|
Size: 411
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| [[Nika2Run72|Back to the main NIKA2 run 72 page]] |
|
| Line 3: | Line 7: |
| To be done | To be progressively updated, when the re-commissioning data are being analyzed. == PIIC data reduction == === Beam maps new analysis === This new analysis of the beam maps extends what was done during the re-commissioning weeks (see [[DailyReportsNika2Run72|the daily reports]]) |
Back to the main NIKA2 run 72 page
Data reduction of run 72 (re-commissioning) and results
To be progressively updated, when the re-commissioning data are being analyzed.
PIIC data reduction
Beam maps new analysis
This new analysis of the beam maps extends what was done during the re-commissioning weeks (see the daily reports)
