⇤ ← Revision 1 as of 2013-05-02 08:49:09
Size: 719
Comment:
|
Size: 775
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Preparation to Run6 | Preparation visit before Run6 |
Line 3: | Line 3: |
In May 2013, 3 people come to the 30m to install the new 2mm array and replace the 1mm cold amplifier. Then, a cooling down will occur and the NIKA prototype stays cold until the Run6 starts. | [[NikaRun6|Back to the NIKA run 6]] In May 2013, 3 people come to the 30m to install the new 2mm array and replace the 1mm cold amplifier. Then, a cooling down will occur and the NIKA prototype stays cold until the Run6 proper starts. |
Preparation visit before Run6
In May 2013, 3 people come to the 30m to install the new 2mm array and replace the 1mm cold amplifier. Then, a cooling down will occur and the NIKA prototype stays cold until the Run6 proper starts.
Tuesday 14-May-2013: 10h (during maintenance) Open cryostat, replace array at 2mm and the 1mm cold amplifier. Install the new DC cables for the amplifier. Install a new 4K magnetic screen. Install electronics rack in the cabin and connect. In the evening, start cooling down.
15-17 May 2013: cooling down
18 May 2013: check resonances in a dark configuration and end the preparation as soon as it is ready
Alessandro Monfardini, Martino Calvo and Nello D'Addabbo come by car from Grenoble.