Differences between revisions 27 and 30 (spanning 3 versions)
Revision 27 as of 2009-02-05 11:32:16
Size: 1619
Editor: visitor6
Comment:
Revision 30 as of 2009-02-05 11:51:59
Size: 1638
Editor: visitor6
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
|| +Guillermo+Albrecht || || || || || +Guillermo+Albrecht || || || Astronomer on Duty ||
Line 33: Line 33:
|| A.Karin || || || || || A.Karim || || || ||

Schedule for the Winter 2008/2009 MAMBO Pool

[https://mrt-lx3.iram.es/flexible/PoolW0809/log/bolologlinks.html Daily Logs] (not yet active)

30m Observer Schedule:

Pool Week #1: Feb 24 - Mar 03 (mainly day time)

Observer

Arrival

Departure

Observing for

J.F. Gómez

24.02

03.03

182-08

+Guillermo+Albrecht

Astronomer on Duty

Pool Week #2: Mar 3 - 10 (day & night)

Observer

Arrival

Departure

Observing for

A.Hacar

P.Frau

???

Pool Week #3: Mar 10 - 17 (night time)

Observer

Arrival

Departure

Observing for

Philippe Andre

10.3.

17.3.

147-08

Alain Omont

10.3

17.3

234-08, 244-08

Pool Week #4: Mar 17 - 24 (night time)

Observer

Arrival

Departure

Observing for

P.Pérez-González

???

Pool Week #5: Mar 24 - 31 (few nights)

Observer

Arrival

Departure

Observing for

Pool Week #6: Apr 7 - 14 (day & night)

Observer

Arrival

Departure

Observing for

Nimesh Patel

07.04

14.04

145-08

A.Karim

P.Pérez-Gonzáles

Back to Pool page: PoolObserving

PoolW0809 (last edited 2009-04-16 08:26:33 by localhost)