Differences between revisions 15 and 16
Revision 15 as of 2009-01-29 15:24:48
Size: 1140
Editor: visitor6
Comment:
Revision 16 as of 2009-01-30 13:20:30
Size: 1203
Editor: visitor6
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
|| J.F. Gómez || 24.02 || 03.03 || 182-08 ||
Line 22: Line 23:
||Nimesh Patel||07.04||14.04||145_08|| ||Nimesh Patel||07.04||14.04||145-08||
|| || || || ||

Schedule for the Winter 2008/2009 MAMBO Pool

[https://mrt-lx3.iram.es/flexible/PoolW0809/log/bolologlinks.html Daily Logs] (not yet active)

30m Observer Schedule:

Pool Week #1: Feb 24 - Mar 03 (mainly day time)

Observer

Arrival

Departure

Observing for

J.F. Gómez

24.02

03.03

182-08

Pool Week #2: Mar 3 - 10 (night time)

Observer

Arrival

Departure

Observing for

Pool Week #3: Mar 10 - 17 (night time)

Observer

Arrival

Departure

Observing for

Philippe Andre

10.3.

17.3.

147-08

Pool Week #4: Mar 17-24 (2-3 nights)

Observer

Arrival

Departure

Observing for

Pool Week #5: Apr 7 - 14 (day & night)

Observer

Arrival

Departure

Observing for

Nimesh Patel

07.04

14.04

145-08

Back to Pool page: PoolObserving

PoolW0809 (last edited 2009-04-16 08:26:33 by localhost)