Size: 1712
Comment:
|
Size: 1699
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 27: | Line 27: |
20.03-27.03 ; S. Leon ; - ; J.F. Lestrade (190-06), F. Bertoldi (231-06), M. Sawitzki (213-06), A. Maury (172-06) ; ; | 20.03-27.03 ; S. Leon ; - ; J.F. Lestrade (190-06), M. Aravena (231-06, 20-23.03), A. Maury (172-06) ; ; |
The Pool for the Winter period 2006-2007 is getting the following schedule:
- Dec. 4 - Dec. 26
- Jan. 30 - Feb. 20
- Mar. 20 - Apr. 10
[http://mrt-lx3.iram.es/flexible/PoolW0607/log/bolologlinks.html Daily Bolologs] BR
Observer schedule:
Back to Pool page: PoolObserving
Pages for Projects:
[:180-06:180-06] A MAMBO survey of the 1046+59 VLA ultradeep field