| Size: 1674 Comment:  | Size: 1810 Comment:  | 
| Deletions are marked like this. | Additions are marked like this. | 
| Line 25: | Line 25: | 
| 13.02-20.02 ; S. Leon ; - ; A. Omont (126-06), V. Espigarres (145-06), A. Martinez Sansigre (293-06) ; ; | 13.02-20.02 ; S. Leon ; - ; A. Omont (126-06), V. Espigarres (145-06), A. Martinez Sansigre (293-06), N. Fiolet (126-06,16-19.02) ; ; | 
| Line 27: | Line 27: | 
| 20.03-27.03 ; S. Leon ;  - ; J.F. Lestrade (190-06), F. Bertoldi (231-06), M. Sawitzki (213-06), A. Maury (172-06) ;  ; 27.03-03.04 ; ; B. Ocana ; A. Moullet (129-06), S. Bottinelli (237-06), F. Schuller (065-06), A. Harris (180-06, 29.03/03.04) ; ; S. Leon 03.04-10.04 ; S. Leon ; - ; T. Greve (207-06), H. Dannerbauer (164-06), C. Vlahakis (228-06), D. Garcia (216-06) ; ; | 20.03-27.03 ; S. Leon ;  - ; J.F. Lestrade (190-06), M. Aravena (231-06, 20-23.03), A. Maury (172-06), M. Sawitzki (213-06), J.E Ruiz (145-06, 23-27.03) ; R. Zylka (IRAM, 23-27.03)  ; 27.03-03.04 ; S. Leon (30.03-03.04) ; A. Sievers (27-30.03) ; A. Moullet (129-06), S. Bottinelli (237-06), F. Schuller (065-06), A. Harris (180-06, 29.03/03.04) ; ; S. Leon 03.04-10.04 ; - ; B. Ocana; T. Greve (207-06), H. Dannerbauer (06/10.04,164-06), C. Vlahakis (228-06), D. Garcia (216-06) ; ; | 
The Pool for the Winter period 2006-2007 is getting the following schedule:
- Dec. 4 - Dec. 26
- Jan. 30 - Feb. 20
- Mar. 20 - Apr. 10
 [http://mrt-lx3.iram.es/flexible/PoolW0607/log/bolologlinks.html Daily Bolologs] BR
 [http://mrt-lx3.iram.es/flexible/PoolW0607/log/bolologlinks.html Daily Bolologs] BR 
Observer schedule:
Back to Pool page: PoolObserving
Pages for Projects:
[:180-06:180-06] A MAMBO survey of the 1046+59 VLA ultradeep field
