Differences between revisions 1 and 2
Revision 1 as of 2006-09-12 07:47:06
Size: 420
Editor: gra-lt6
Comment:
Revision 2 as of 2006-11-06 10:50:23
Size: 517
Editor: gra-lt6
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * TBA  * Dec. 5 - Dec. 22
Line 15: Line 15:
; ; ; ; ; 05.12-12.12; S. Leon ; ; ; ;
12.12-19.12; ; B. Ocana ; ; ;
19.12-22.12; S. Leon ; ; ;

The Pool for the Winter period 2006-2007 is getting the following schedule:

  • Dec. 5 - Dec. 22

{i} [http://mrt-lx2.iram.es/flexible/PoolW0607/log/bolologlinks.html Daily Bolologs]

Observer schedule:

Pool Week Coordinator AoD Observers Comments Coordinator
(Telescope) (Granada)
05.12-12.12 S. Leon
12.12-19.12 B. Ocana
19.12-22.12 S. Leon

Back to Pool page: PoolObserving

PoolW0607 (last edited 2009-04-16 08:26:30 by localhost)