Size: 2007
Comment:
|
Size: 2192
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
<!> All heterodyne observations between 23.1.2006 and 1.3.2006 were affected by a miscalculated Doppler correction. You can find here the list of the scans and the projects affected. |
The Pool for the winter period 2005-06 is getting the following schedule:
- Nov 29 - Dec 20(/23)
- Jan. 10 - Jan. 31
- Feb. 21 - March 21
[http://mrt-lx2.iram.es/flexible/PoolW0506/log/bolologlinks.html Daily Bolologs]
All heterodyne observations between 23.1.2006 and 1.3.2006 were affected by a miscalculated Doppler correction. You can find here the list of the scans and the projects affected.
Observer schedule:
NOTES:
(*): IRAM Summer School Volunteers.