2007
Comment:
|
← Revision 101 as of 2009-04-16 08:26:47 ⇥
2271
converted to 1.6 markup
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
{i} [http://mrt-lx2.iram.es/flexible/PoolW0506/log/bolologlinks.html Daily Bolologs] | {i} [[http://mrt-lx3.iram.es/flexible/PoolW0506/log/bolologlinks.html|Daily Bolologs]] |
Line 11: | Line 11: |
<!> All heterodyne observations between 23.1.2006 and 1.3.2006 were affected by a miscalculated Doppler correction. You can find here the list of the scans and the projects affected: [[attachment:FilePoolFreqShift.txt]] |
|
Line 37: | Line 39: |
Back to Pool page: PoolObserving |
The Pool for the winter period 2005-06 is getting the following schedule:
- Nov 29 - Dec 20(/23)
- Jan. 10 - Jan. 31
- Feb. 21 - March 21
All heterodyne observations between 23.1.2006 and 1.3.2006 were affected by a miscalculated Doppler correction. You can find here the list of the scans and the projects affected: FilePoolFreqShift.txt
Observer schedule:
NOTES:
(*): IRAM Summer School Volunteers.
Back to Pool page: PoolObserving