Size: 1805
Comment:
|
Size: 1784
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 27: | Line 27: |
28.02-07.03, Tu-Tu; - ; N. Marcelino ; F. Walter (207_05, 27.02-03.03), C. Carilli (175_05), J. Greaves (182_05, --03.03), A. Omont (202_05, 03.03--), N. Bavouzet (202_05, 03.03--), T. Greve (160_05); - ; S.Leon | 28.02-07.03, Tu-Tu; - ; N. Marcelino ; F. Walter (207_05, 27.02-03.03), J. Greaves (182_05, --03.03), A. Omont (202_05, 03.03--), N. Bavouzet (202_05, 03.03--), T. Greve (160_05); - ; S.Leon |
The Pool for the winter period 2005-06 is getting the following schedule:
- Nov 29 - Dec 20(/23)
- Jan. 10 - Jan. 31
- Feb. 21 - March 14
[http://mrt-lx2.iram.es/flexible/PoolW0506/log/bolologlinks.html Daily Bolologs]
Observer schedule:
NOTES:
(*): IRAM Summer School Volunteers.