|
Size: 1805
Comment:
|
Size: 2265
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 7: | Line 7: |
| * Feb. 21 - March 14 | * Feb. 21 - March 21 |
| Line 9: | Line 9: |
| {i} [http://mrt-lx2.iram.es/flexible/PoolW0506/log/bolologlinks.html Daily Bolologs] | {i} [http://mrt-lx3.iram.es/flexible/PoolW0506/log/bolologlinks.html Daily Bolologs] |
| Line 11: | Line 11: |
| <!> All heterodyne observations between 23.1.2006 and 1.3.2006 were affected by a miscalculated Doppler correction. You can find here the list of the scans and the projects affected: attachment:FilePoolFreqShift.txt |
|
| Line 27: | Line 29: |
| 28.02-07.03, Tu-Tu; - ; N. Marcelino ; F. Walter (207_05, 27.02-03.03), C. Carilli (175_05), J. Greaves (182_05, --03.03), A. Omont (202_05, 03.03--), N. Bavouzet (202_05, 03.03--), T. Greve (160_05); - ; S.Leon 07.03-14.03, Tu-Tu; S.Leon; - ;F. Bertoldi (188_05), N. Seymour (143_05), J.F. Lestrade (167_05), A. Biggs (160_05); B. Ocaña training; - |
28.02-07.03, Tu-Tu; - ; N. Marcelino ; F. Walter (207_05, 27.02-03.03), J. Greaves (182_05, --03.03), A. Omont (202_05, 03.03--), N. Bavouzet (202_05, 03.03--), T. Greve (160_05); - ; S.Leon 07.03-14.03, Tu-Tu; S.Leon; - ;N. Seymour (143_05), A. Biggs (160_05); B. Ocaña training, JdD Santander Vela visiting for pool archive (07.03-14.03); - 14.03-21.03, Tu-Tu; - ; S. Martin ; J. Kauffman (220_05), J.F. Lestrade (167_05), F. Bertoldi (188_05); - ; S. Leon ; ; ; ; ; 29.04-02.05, Sat-Tu; S. Leon ; S. Martin; TBD ; Short extra pool session ; |
| Line 34: | Line 39: |
Back to Pool page: PoolObserving |
The Pool for the winter period 2005-06 is getting the following schedule:
- Nov 29 - Dec 20(/23)
- Jan. 10 - Jan. 31
- Feb. 21 - March 21
[http://mrt-lx3.iram.es/flexible/PoolW0506/log/bolologlinks.html Daily Bolologs]
All heterodyne observations between 23.1.2006 and 1.3.2006 were affected by a miscalculated Doppler correction. You can find here the list of the scans and the projects affected: attachment:FilePoolFreqShift.txt
Observer schedule:
NOTES:
(*): IRAM Summer School Volunteers.
Back to Pool page: PoolObserving
