Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m:
Heterodyne:
- To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
- To setup the backends.
- To setup a wobbler-switching procedure.
- To setup a position-switching procedure.
- To setup a frequency-switching procedure.