510
Comment:
|
762
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m: | Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m. |
Line 11: | Line 11: |
== Bolometer: == For the bolometer observations, indicate the old commands in your {{{ObsForm}}}, we will adapt them accordingly. <!> Don't forget to fill up your {{{ObsForm}}}, it will ensure that your project is correctly observed. |
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m.
Heterodyne:
- To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
- To setup the backends: attachment:backends-xxx_xx.pako
- To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
- To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
- To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako
Bolometer:
For the bolometer observations, indicate the old commands in your ObsForm, we will adapt them accordingly.
Don't forget to fill up your ObsForm, it will ensure that your project is correctly observed.