510
Comment:
|
659
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m: | Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m. |
Line 11: | Line 11: |
== Bolometer: == For the bolometer observations, indicate the old commands in your {{{ObsForm}}}, we will adapt them accordingly. |
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m.
Heterodyne:
- To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
- To setup the backends: attachment:backends-xxx_xx.pako
- To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
- To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
- To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako
Bolometer:
For the bolometer observations, indicate the old commands in your ObsForm, we will adapt them accordingly.