Differences between revisions 7 and 8
Revision 7 as of 2005-11-25 12:42:53
Size: 510
Editor: visitor10
Comment:
Revision 8 as of 2005-11-25 12:46:36
Size: 659
Editor: visitor10
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m: Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m.
Line 11: Line 11:


== Bolometer: ==

For the bolometer observations, indicate the old commands in your {{{ObsForm}}}, we will adapt them accordingly.




 

Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m.

Heterodyne:

  • To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
  • To setup the backends: attachment:backends-xxx_xx.pako
  • To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
  • To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
  • To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako

Bolometer:

For the bolometer observations, indicate the old commands in your ObsForm, we will adapt them accordingly.

PoolSetup (last edited 2009-04-16 08:26:39 by localhost)