|
Size: 140
Comment:
|
Size: 345
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 1: | Line 1: |
| Example of Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m: | Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m: |
| Line 3: | Line 3: |
| /!\ To be completed very soon ! | == Heterodyne: == * To setup the SIS project (PI, ProjID, Receiver, Catalogues) * To setup the backends. * To setup a wobbler-switching procedure. * To setup a position-switching procedure. * To setup a frequency-switching procedure. |
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m:
Heterodyne:
- To setup the SIS project (PI, ProjID, Receiver, Catalogues)
- To setup the backends.
- To setup a wobbler-switching procedure.
- To setup a position-switching procedure.
- To setup a frequency-switching procedure.
