61
Comment:
|
345
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Describe PoolSetup here. | Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m: |
Line 3: | Line 3: |
/!\ To be completed very soon ! | == Heterodyne: == * To setup the SIS project (PI, ProjID, Receiver, Catalogues) * To setup the backends. * To setup a wobbler-switching procedure. * To setup a position-switching procedure. * To setup a frequency-switching procedure. |
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m:
Heterodyne:
- To setup the SIS project (PI, ProjID, Receiver, Catalogues)
- To setup the backends.
- To setup a wobbler-switching procedure.
- To setup a position-switching procedure.
- To setup a frequency-switching procedure.