Differences between revisions 26 and 27
Revision 26 as of 2006-05-11 08:42:33
Size: 1616
Editor: visitor9
Comment:
Revision 27 as of 2007-11-27 08:44:17
Size: 1672
Editor: lt-sl
Comment:
Deletions are marked like this. Additions are marked like this.
Line 35: Line 35:

Monitor (mopsic): On-Off

attachment:monitor-1.jpg

Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m. The .pako extension is understood by the paKo software which produces the xml files to run the observations.

Heterodyne:

  • To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
  • To setup the backends: attachment:backends-xxx_xx.pako
  • To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
  • To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
  • To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako
  • Here is a model of the line catalog, use a specific name for your project: attachment:model.lin

<!> VESPA: Note that by default the receivers are in wide mode, except the 3mm receivers. The sky frequency that you specify appears at 598MHz in the IF which is close to the upper limit of VESPA. The receivers should be configured in narrow mode for VESPA for normal observations.

Bolometer:

For the bolometer observations, indicate the old commands in your ObsForm, we will adapt them accordingly.

  • The onf.pako macro allows an onOff integration, typically you can use it as: pako> @onf 20 35 (it performs a 20x60sec integration with a wobbler throw of 35")

  • For the mapping indicate with the old syntax, we will adapt it.

<!> Don't forget to fill up your ObsForm in the DB, it will ensure that your project is correctly observed.

Snapshots:

Pako (@wbolo macro)

attachment:pakosnapshot1.jpg

Monitor (mopsic): On-Off

attachment:monitor-1.jpg

PoolSetup (last edited 2009-04-16 08:26:39 by localhost)