Differences between revisions 2 and 5 (spanning 3 versions)
Revision 2 as of 2005-11-08 19:30:37
Size: 59
Editor: mrt-aod
Comment:
Revision 5 as of 2005-11-25 12:37:59
Size: 345
Editor: visitor10
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Describe PoolSetup here.
/!\ To be completed very soon !
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m:


== Heterodyne: ==

 * To setup the SIS project (PI, ProjID, Receiver, Catalogues)
 * To setup the backends.
 * To setup a wobbler-switching procedure.
 * To setup a position-switching procedure.
 * To setup a frequency-switching procedure.

Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m:

Heterodyne:

  • To setup the SIS project (PI, ProjID, Receiver, Catalogues)
  • To setup the backends.
  • To setup a wobbler-switching procedure.
  • To setup a position-switching procedure.
  • To setup a frequency-switching procedure.

PoolSetup (last edited 2009-04-16 08:26:39 by localhost)