Differences between revisions 2 and 4 (spanning 2 versions)
Revision 2 as of 2005-11-08 19:30:37
Size: 59
Editor: mrt-aod
Comment:
Revision 4 as of 2005-11-09 01:14:26
Size: 140
Editor: mrt-aod
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Describe PoolSetup here. Example of Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m:

Example of Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m:

/!\ To be completed very soon !

PoolSetup (last edited 2009-04-16 08:26:39 by localhost)