Differences between revisions 19 and 20
Revision 19 as of 2005-12-02 02:39:40
Size: 1391
Editor: visitor15
Comment:
Revision 20 as of 2005-12-02 02:40:42
Size: 1233
Editor: visitor15
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
/!\ Note that messages in aloop are not anymore useful since the START command create an .xml file, send it to the queue and pass to the next loop directly.

Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m. The .pako extension is understood by the paKo software which produces the xml files to run the observations.

Heterodyne:

  • To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
  • To setup the backends: attachment:backends-xxx_xx.pako
  • To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
  • To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
  • To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako
  • Here is a model of the line catalog, use a specific name for your project: attachment:model.lin

Bolometer:

For the bolometer observations, indicate the old commands in your ObsForm, we will adapt them accordingly.

  • The onf.pako macro allows an onOff integration, typically you can use it as: pako> @onf 20 35 (it performs a 20x60sec integration with a wobbler throw of 35)

  • For the mapping indicate with the old syntax, we will adapt it.

<!> Don't forget to fill up your ObsForm in the DB, it will ensure that your project is correctly observed.

PoolSetup (last edited 2009-04-16 08:26:39 by localhost)