Differences between revisions 17 and 20 (spanning 3 versions)
Revision 17 as of 2005-11-29 12:16:07
Size: 1053
Editor: visitor15
Comment:
Revision 20 as of 2005-12-02 02:40:42
Size: 1233
Editor: visitor15
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * Here is a model of the line catalog, use a specific name for your project: attachment:model.lin
Line 13: Line 14:
/!\ Note that messages in aloop are not anymore useful since the START command create an .xml file, send it to the queue and pass to the next loop directly.
Line 19: Line 19:
 * The ''onf.pako'' macro allows an onOff integration, typically you can use it as: pako> @onf 20 35 (it performs a 20x60sec integration with a wobbler throw of 35'')
 * For the mapping indicate with the old syntax, we will adapt it.

Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m. The .pako extension is understood by the paKo software which produces the xml files to run the observations.

Heterodyne:

  • To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
  • To setup the backends: attachment:backends-xxx_xx.pako
  • To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
  • To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
  • To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako
  • Here is a model of the line catalog, use a specific name for your project: attachment:model.lin

Bolometer:

For the bolometer observations, indicate the old commands in your ObsForm, we will adapt them accordingly.

  • The onf.pako macro allows an onOff integration, typically you can use it as: pako> @onf 20 35 (it performs a 20x60sec integration with a wobbler throw of 35)

  • For the mapping indicate with the old syntax, we will adapt it.

<!> Don't forget to fill up your ObsForm in the DB, it will ensure that your project is correctly observed.

PoolSetup (last edited 2009-04-16 08:26:39 by localhost)