Differences between revisions 14 and 15
Revision 14 as of 2005-11-25 13:09:05
Size: 899
Editor: visitor10
Comment:
Revision 15 as of 2005-11-25 13:09:26
Size: 893
Editor: visitor10
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m. The .pako extension is understood by the ´´´paKo´´´ software which produces the xml files to run the observations. Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m. The .pako extension is understood by the '''paKo''' software which produces the xml files to run the observations.

Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m. The .pako extension is understood by the paKo software which produces the xml files to run the observations.

Heterodyne:

  • To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
  • To setup the backends: attachment:backends-xxx_xx.pako
  • To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
  • To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
  • To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako

Bolometer:

For the bolometer observations, indicate the old commands in your ObsForm, we will adapt them accordingly.

<!> Don't forget to fill up your ObsForm in the DB, it will ensure that your project is correctly observed.

PoolSetup (last edited 2009-04-16 08:26:39 by localhost)