Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2005-11-08 19:30:17
Size: 59
Editor: mrt-aod
Comment:
Revision 7 as of 2005-11-25 12:42:53
Size: 510
Editor: visitor10
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Describe PoolSetup here.
\!/ To be completed very soon !
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m:


== Heterodyne: ==

 * To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
 * To setup the backends: attachment:backends-xxx_xx.pako
 * To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
 * To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
 * To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako

Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m:

Heterodyne:

  • To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
  • To setup the backends: attachment:backends-xxx_xx.pako
  • To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
  • To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
  • To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako

PoolSetup (last edited 2009-04-16 08:26:39 by localhost)