Differences between revisions 1 and 16 (spanning 15 versions)
Revision 1 as of 2005-11-08 19:30:17
Size: 59
Editor: mrt-aod
Comment:
Revision 16 as of 2005-11-29 12:15:41
Size: 1055
Editor: visitor15
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Describe PoolSetup here.
\!/ To be completed very soon !
Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m. The .pako extension is understood by the '''paKo''' software which produces the xml files to run the observations.


== Heterodyne: ==

 * To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
 * To setup the backends: attachment:backends-xxx_xx.pako
 * To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
 * To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
 * To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako


/!\ Note that messages in the loop are not anymore useful since the START command create an xml file, send it to the queue and pass to the next loop directly.

== Bolometer: ==

For the bolometer observations, indicate the old commands in your {{{ObsForm}}}, we will adapt them accordingly.


<!> Don't forget '''to fill up your {{{ObsForm}}} in the DB''', it will ensure that your project is correctly observed.

 

Heterodyne/Bolometer observing procedures with the New Control System (NCS) at the IRAM-30m. The .pako extension is understood by the paKo software which produces the xml files to run the observations.

Heterodyne:

  • To setup the SIS project (PI, ProjID, Receiver, Catalogues) : attachment:setup-xxx_xx.pako
  • To setup the backends: attachment:backends-xxx_xx.pako
  • To setup a wobbler-switching procedure: attachment:target-wsw-xxx_xx.pako
  • To setup a position-switching procedure: attachment:target-psw-xxx_xx.pako
  • To setup a frequency-switching procedure: attachment:target-fsw-xxx_xx.pako

/!\ Note that messages in the loop are not anymore useful since the START command create an xml file, send it to the queue and pass to the next loop directly.

Bolometer:

For the bolometer observations, indicate the old commands in your ObsForm, we will adapt them accordingly.

<!> Don't forget to fill up your ObsForm in the DB, it will ensure that your project is correctly observed.

PoolSetup (last edited 2009-04-16 08:26:39 by localhost)