Differences between revisions 8 and 12 (spanning 4 versions)
Revision 8 as of 2006-05-08 14:59:01
Size: 633
Editor: visitor9
Comment:
Revision 12 as of 2006-05-09 09:48:10
Size: 654
Editor: visitor9
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
01.06-6.06,Tu-Tu ; S.Leon ; - ;R. Zylka (IRAM), A. Sicilia-Aguilar (110_06)
; Test with Mambo I ; -
01.06-6.06,Tu-Tu ; S.Leon ; - ;R. Zylka (IRAM), A. Sicilia-Aguilar (110_06), U. Lisenfeld (005_06); Test with Mambo I ; -

The Pool for the Summer period 2006 is getting the following schedule:

  • June 1 - June 6
  • Oct. 10 - Oct. 17
  • Oct. 17 - Oct. 24

{i} [http://mrt-lx2.iram.es/flexible/PoolS06/log/bolologlinks.html Daily Bolologs]

Observer schedule:

Pool Week Coordinator AoD Observers Comments Coordinator
(Telescope) (Granada)
01.06-6.06,Tu-Tu S.Leon - R. Zylka (IRAM), A. Sicilia-Aguilar (110_06), U. Lisenfeld (005_06) Test with Mambo I -
10.10-17.10, Tu-Tu S.Leon - TBD - -
17.10-24.10, Tu-Tu - TBD TBD - S.Leon

PoolS06 (last edited 2009-04-16 08:26:41 by localhost)