Differences between revisions 4 and 5
Revision 4 as of 2006-05-08 06:27:12
Size: 607
Editor: visitor9
Comment:
Revision 5 as of 2006-05-08 08:31:48
Size: 607
Editor: visitor9
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
30.05-6.06,Tu-Tu ; S.Leon ; - ;R. Zylka (IRAM), TBD ; Test with Mambo I ; - 02.06-6.06,Tu-Tu ; S.Leon ; - ;R. Zylka (IRAM), TBD ; Test with Mambo I ; -

The Pool for the Summer period 2006 is getting the following schedule:

  • May 31 - June 6
  • Oct. 10 - Oct. 17
  • Oct. 17 - Oct. 24

{i} [http://mrt-lx2.iram.es/flexible/PoolS06/log/bolologlinks.html Daily Bolologs]

Observer schedule:

Pool Week Coordinator AoD Observers Comments Coordinator
(Telescope) (Granada)
02.06-6.06,Tu-Tu S.Leon - R. Zylka (IRAM), TBD Test with Mambo I -
10.10-17.10, Tu-Tu S.Leon - TBD - -
17.10-24.10, Tu-Tu - TBD TBD - S.Leon

PoolS06 (last edited 2009-04-16 08:26:41 by localhost)