Differences between revisions 27 and 28
Revision 27 as of 2006-09-18 08:23:51
Size: 906
Editor: gra-lt6
Comment:
Revision 28 as of 2006-09-18 08:28:20
Size: 871
Editor: gra-lt6
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
15.10-24.10, Tu-Tu; - ;B. Ocaña ; J.F. Lestrade (16.10-24.10, 070_06), C. Tapken (17.10-24.10, 019_06), A. Baker (19.10-24.10, 055_06) ; Scheduled to be decided definitively ; S. Leon 15.10-24.10, Tu-Tu; - ;B. Ocaña ; J.F. Lestrade (16.10-24.10, 070_06), C. Tapken (17.10-24.10, 019_06), A. Baker (19.10-24.10, 055_06) ; ; S. Leon

The Pool for the Summer period 2006 is getting the following schedule:

  • June 1 - June 6
  • Oct. 10 - Oct. 17
  • Oct. 17 - Oct. 24

{i} [http://mrt-lx2.iram.es/flexible/PoolS06/log/bolologlinks.html Daily Bolologs]

Observer schedule:

Pool Week Coordinator AoD Observers Comments Coordinator
(Telescope) (Granada)
01.06-6.06,Tu-Tu S.Leon - R. Zylka (IRAM), A. Sicilia-Aguilar (110_06), U. Lisenfeld (005_06) Test with Mambo I -
3.10-12.10, Tu-Tu S.Leon - J. Kurk (6.10-12.10, 052_06), F. Montenegro Montes (11.10-17.10, 029_06+060_06) - -
15.10-24.10, Tu-Tu - B. Ocaña J.F. Lestrade (16.10-24.10, 070_06), C. Tapken (17.10-24.10, 019_06), A. Baker (19.10-24.10, 055_06) S. Leon

Back to Pool page: PoolObserving

PoolS06 (last edited 2009-04-16 08:26:41 by localhost)