Differences between revisions 25 and 26
Revision 25 as of 2006-09-04 12:19:22
Size: 859
Editor: visitor2
Comment:
Revision 26 as of 2006-09-05 09:37:00
Size: 910
Editor: visitor2
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
3.10-12.10, Tu-Tu; S.Leon ; - ; J. Kurk (6.10-12.10, 052_06); - ; - 3.10-12.10, Tu-Tu; S.Leon ; - ; J. Kurk (6.10-12.10, 052_06), F. Montenegro Montes (11.10-17.10, 029_06+060_06); - ; -

The Pool for the Summer period 2006 is getting the following schedule:

  • June 1 - June 6
  • Oct. 10 - Oct. 17
  • Oct. 17 - Oct. 24

{i} [http://mrt-lx2.iram.es/flexible/PoolS06/log/bolologlinks.html Daily Bolologs]

Observer schedule:

Pool Week Coordinator AoD Observers Comments Coordinator
(Telescope) (Granada)
01.06-6.06,Tu-Tu S.Leon - R. Zylka (IRAM), A. Sicilia-Aguilar (110_06), U. Lisenfeld (005_06) Test with Mambo I -
3.10-12.10, Tu-Tu S.Leon - J. Kurk (6.10-12.10, 052_06), F. Montenegro Montes (11.10-17.10, 029_06+060_06) - -
14or16.10-24.10, Tu-Tu - B. Ocaña J.F. Lestrade (16.10-24.10, 070_06), C. Tapken (17.10-24.10, 019_06), A. Baker (19.10-24.10, 055_06) Scheduled to be decided definitively S. Leon

Back to Pool page: PoolObserving

PoolS06 (last edited 2009-04-16 08:26:41 by localhost)