Differences between revisions 13 and 14
Revision 13 as of 2006-06-02 20:38:48
Size: 666
Editor: visitor9
Comment:
Revision 14 as of 2006-08-29 10:58:00
Size: 683
Editor: visitor11
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
10.10-17.10, Tu-Tu; S.Leon ; - ; J.F. Lestrade, ; - ; -
17.10-24.10, Tu-Tu; - ; TBD ; TBD ; - ; S.Leon
3.10-10.10, Tu-Tu; S.Leon ; - ; J.F. Lestrade ()?, ; - ; -
17.10-24.10, Tu-Tu; S. Leon ; - ; C. Tapken (019_06) ; - ; -

The Pool for the Summer period 2006 is getting the following schedule:

  • June 1 - June 6
  • Oct. 10 - Oct. 17
  • Oct. 17 - Oct. 24

{i} [http://mrt-lx2.iram.es/flexible/PoolS06/log/bolologlinks.html Daily Bolologs]

Observer schedule:

Pool Week Coordinator AoD Observers Comments Coordinator
(Telescope) (Granada)
01.06-6.06,Tu-Tu S.Leon - R. Zylka (IRAM), A. Sicilia-Aguilar (110_06), U. Lisenfeld (005_06) Test with Mambo I -
3.10-10.10, Tu-Tu S.Leon - J.F. Lestrade ()?, - -
17.10-24.10, Tu-Tu S. Leon - C. Tapken (019_06) - -

PoolS06 (last edited 2009-04-16 08:26:41 by localhost)