Differences between revisions 8 and 9
Revision 8 as of 2005-10-22 06:35:30
Size: 765
Editor: mrt-lx2
Comment:
Revision 9 as of 2005-10-24 19:23:34
Size: 780
Editor: mrt-lx2
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
||25.10-01.11, Tu - Tu ||||S.Leon|||| - ||||A. Weiss, J. Sabater Montes||||-|||| - || ||25.10-01.11, Tu - Tu ||||S.Leon|||| - ||||A. Weiss (until Fri 28), J. Sabater Montes||||-|||| - ||

The Pool for the summer period 2005 is getting the following scheduling:

Observer schedule:

Pool Week

Coordinator

AoD

Observers

Comments

Coordinator

(Telescope)

(Granada)

21.10-25.10, Fr - Tu

S.Leon

N.Marcelino

R. Zylka, P. Ruffle

-

-

25.10-01.11, Tu - Tu

S.Leon

-

A. Weiss (until Fri 28), J. Sabater Montes

-

-

01.11-08.11, Tu-Tu

-

S. Martin

C. Thum

NCS switch

S. Leon

09.11-15.11, Tu-Tu

S. Leon

-

F. Damour

NCS switch, no external observers

-

PoolS05 (last edited 2009-04-16 08:26:34 by localhost)